Specialist Task Force 516:
Mandate M/462 Efficient energy use in fixed and mobile ICT networks
Who we are:
Team leader: |
- Michael Gilmore, e-Ready Building Limited
|
Team Members: |
- Mark Acton, CBRE
- Raffaele Bolla, CNIT
- Gilles Dretsch, Orange
- Guillaume Gerard, Orange
- Philippe Moretto, GNSS
- Hans-Otto Scheck, Nokia Solutions and Networks GmbH & Co. KG
- Simon Singh-Kang, IT Management Services Ltd
- Henry Wong, E3HS IT Consulting, LLC
- Daniel Dianat, Ericsson
- Flavio Cucchietti, Skylane Optics
|
What we do
STF 516 is preparing European Norms (ENs) to fulfil Mandate M/462 according to the analysis reported in the Phase 1 and 2 reports in relation to the Mandate. This activity addresses the first set of ENs identified as being of highest priority in this proposal.
The ENs address:
- equipment and system standards: these standards have to take into account the most efficient solutions in order to minimize energy consumption and to optimize end-of-life environmental impacts.
- KPIs with methodologies to determine equipment energy efficiency: standardized and simple test procedures to determine power consumption and relevant service use by equipment.
- standardized global indicators (ratios): to monitor the improvement of overall efficiency of operational networks - these ratios provide recognized energy efficiency trends for sites and networks in order to define the efficiency level of each ICT network segment.
- methodologies to evaluate Information Technology & Networks (ITN) equipment end-of-life environmental impacts.
The STF will issue 13 European Norms (ENs) as described below in support of the implementation of an efficient infrastructure of Information and Communication Technology (ICT) in the following areas:
- sites: access site, radio access, central office, core site, e.g. transmission site or data centre;
- long haul/backbone using optical fibre technologies;
- transit/metropolitan edge/back haul using optical fibre technologies;
- access, including transport and local distribution concentrating on optical fibre technologies and radio based stations;
- residential, including end-user connections.
Example of produced's drafts:
- STF516-WD1_305_174-5-1_V002
- STF516-SD2 303471
- STF516-SD2_305200-2-3
- STF516-SD3_305200-2-2
The objective of ETSI is to complete the required standards for M/462 by the end of 2017/Q1 2018.
A further STF will be established to address the remaining ENs listed as high priority in the Phase 2 report in relation to Mandate M/462.
For more details, see our Terms of Reference
Deliverables & Time plan
|
Target date
|
Deliv.
|
Area
|
TC
|
WI
|
Title
|
Start of Public Approval
|
Publication
|
D01
|
NW/OP sites
|
ATTM
|
DEN/ATTM-020002
|
Broadband Deployment & Lifecycle Resource Management; ICT Sites
|
Aug 17
|
Feb 18
|
D02
|
NW/OP sites
|
ATTM
|
DEN/ATTM-020003
|
Energy management; Global KPIs; Operational infrastructures; General requirements
|
Jul 17
|
Feb 18
|
D03
|
NW/OP sites
|
ATTM
|
DEN/ATTM-020004
|
Energy management; Global KPIs; Operational infrastructures; Specific requirements; ICT Sites
|
Jul 17
|
Feb 18
|
D04
|
NW/OP sites
|
ATTM
|
DEN/ATTM-020005
|
Energy management; Global KPIs; Operational infrastructures; Specific requirements; Global KPI for ICT Sites
|
Jul 17
|
Feb 18
|
D05
|
NW/OP sites
|
EE
|
DEN/EE-EEPS24
|
Measurement Process for Energy Efficiency KPI for Servers
|
Dec 17
|
May 18
|
D06
|
Fixed access
|
ATTM
|
DEN/ATTM-020006
|
Energy management; Global KPIs; Operational infrastructures; Specific requirements; Fixed Broadband access networks
|
Dec 17
|
May 18
|
D07
|
Fixed access
|
CABLE
|
DEN/CABLE-000022
|
Energy management; Global KPIs; Operational infrastructures; Specific requirements; Cable access networks
|
Dec 17
|
May 18
|
D08
|
Mobile access
|
ATTM
|
DEN/ATTM-020007
|
Energy management; Global KPIs; Operational infrastructures; Specific requirements; Mobile access networks
|
Dec 17
|
May 18
|
D09
|
Mobile access
|
EE
|
DEN/EE-EEPS25
|
Measurement Process for Energy Efficiency KPI for RAN Equipment
|
Dec 17
|
May 18
|
D10
|
Customer premises
|
ATTM
|
DEN/ATTM-020008
|
Broadband Deployment & Lifecycle Resource Management; Customer network infrastructures; Homes (single-tenant)
|
Dec 17
|
May 18
|
D11
|
Customer premises
|
ATTM
|
DEN/ATTM-020009
|
Broadband Deployment & Lifecycle Resource Management; Overview, common and generic aspects.
|
Dec 17
|
May 18
|
D12
|
NW design
|
EE
|
DEN/EE-EEPS26
|
Energy efficiency measurement method and KPIs of Network Function Virtualization (NFV) applications in ICT networks
|
Dec 17
|
May 18
|
D13
|
NW design
|
ATTM
|
DEN/ATTM-020010
|
Broadband Deployment & Lifecycle Resource Management; Management of end of life of ICT equipment (ICT waste/End of life)
|
Dec 17
|
May 18
|
How to contact us
For further details, or if you wish to be involved in the work of the STF, please contact the STF
Leader: Michael Gilmore