STF Process calendar
ETSI Board evaluates technical proposals and decides on budget allocation.
Calendar for allocation of the 2026 FWP budget
|
Calendar for the 2026 FWP Allocation calendar
|
|
Until 02 September 2025
|
Collect draft ToR from Reference Bodies (RB)
download Template with instructions
and the Presentation of STF proposals in PowerPoint here
Please upload your contribution here.
|
|
03 September - 08 September 2025
|
Consistency check between ETSI Secretariat and RBs
Full ToR are RB approved and made available
|
| 09 - 22 September 2025 |
Board Review |
|
23 - 25 September 2025
|
During a session dedicated to STF/TTF review, Board#154 evaluates the proposals and approves the funding (subject to definitive approval by the autumn GA)
|
|
02-03 December 2025
|
ETSI 2026 budget, including FWP budget, is approved at GA#86
|
Guidelines
If the request concerns the continuation of an existing STF activity, the Reference Body (RB) must provide an overview of the results achieved and resources spent by the previous STFs in this domain.
The ToR must provide a detailed description of the work to be done and an accurate estimate of the maximum budget required to perform the work.
The ETSI Secretariat will make a consistency check of the STF request and may come back to the RB Chair with comments and/or proposals to improve the ToR and/or the presentation of the business case to the OCG/Board. If it is not possible to achieve an agreement on the consistency check, the document will be submitted to the OCG/Board consultation according to the instruction of the RB Chair but with comments from the Secretariat.
The STF requests must be approved by the Reference Body before being submitted to the OCG/Board.
Given the time constraints, if the draft ToR have not been approved by the Reference Body before the proposal submission, then the approval calendar must be identified in the ToR.