STF Process calendar
ETSI Board evaluates technical proposals and decides on budget allocation.
Calendar for a possible second allocation of the ETSI STF budget 2026 Allocation (for urgent requests)
Until 21 May 2026
Urgent STF proposals may be submitted here, using the latest STF request template available here. Please also upload the required PowerPoint presentation for your project (PPT_template).
26 May – 09 June 2026
The Board will review all submitted urgent STF proposals during this period.
Board#158 (23–25 June 2026)
During its June meeting, the Board will evaluate the proposals and decide on the allocation of funds from the contingency budget.
Calendar for allocation of the 2027 FWP budget
|
Calendar for the 2027 FWP Allocation calendar
|
|
Until 02 September 2026
|
Collect draft ToR from Reference Bodies (RB)
download Template with instructions
and the Presentation of STF proposals in PowerPoint here
Please upload your contribution here.
|
|
03 September - 07 September 2026
|
Consistency check between ETSI Secretariat and RBs
Full ToR are RB approved and made available
|
| 08 - 21 September 2026
|
Board Review
|
|
22 - 24 September 2026
|
During a session dedicated to STF/TTF review, Board#159 evaluates the proposals and approves the funding (subject to definitive approval by the autumn GA)
|
|
02-03 December 2026
|
ETSI 2027 budget, including FWP budget, is approved at GA#88
|
Guidelines
If the request concerns the continuation of an existing STF activity, the Reference Body (RB) must provide an overview of the results achieved and resources spent by the previous STFs in this domain.
The ToR must provide a detailed description of the work to be done and an accurate estimate of the maximum budget required to perform the work.
The ETSI Secretariat will make a consistency check of the STF request and may come back to the RB Chair with comments and/or proposals to improve the ToR and/or the presentation of the business case to the OCG/Board. If it is not possible to achieve an agreement on the consistency check, the document will be submitted to the OCG/Board consultation according to the instruction of the RB Chair but with comments from the Secretariat.
The STF requests must be approved by the Reference Body before being submitted to the OCG/Board.
Given the time constraints, if the draft ToR have not been approved by the Reference Body before the proposal submission, then the approval calendar must be identified in the ToR.