STF Process calendar

The ETSI budget is allocated by the ETSI Board.

ETSI STF budget 2022 Allocation (for urgent requests only)

Until 27 May 2022: Proposals for urgent STF requests can be considered at the Board#138   (14-16 June 2022) allocation and within the contingency budget


ETSI STF budget 2023 Allocation

The calendar of the ETSI STF FWP Budget 2023 :

ETSI STF budget 2023 Allocation calendar

TBD

Collect draft ToR from Reference Bodies (RB)

download Template with instructions

Please upload your contribution here

TBD

Consistency check between ETSI Secretariat and RB

Full ToR available(RB approved or possibility to get the approval in parallel to this budget allocation)

TBD

Board#139 approval during the afternoon session dedicated to STF/TTF review

TBD

ETSI budget, including STF budget, approved at GA#80

  

  

 

 

 

 

 

 

 


Guidelines

If the request concerns the continuation of an existing STF activity, the Reference Body (RB) must provide an overview of the results achieved and resources spent by the previous STFs in this domain.

The ToR must provide a detailed description of the work to be done and an accurate estimate of the maximum budget required to perform the work.

The ETSI Secretariat will make a consistency check of the STF request and may come back to the RB Chair with comments and/or proposals to improve the ToR and/or the presentation of the business case to the OCG/Board.  If it is not possible to achieve an agreement on the consistency check, the document will be submitted to the OCG/Board consultation according to the instruction of the RB Chair but with comments from the Secretariat.

The STF requests must be approved by the Reference Body before being submitted to the OCG/Board. 

Given the time constraints if the draft ToR have not  been approved by the Reference Body before the submission of the proposal, then the approval calendar must be identified in the ToR.