STFbreadcrumb separatorSTFsbreadcrumb separatorSTF Process Calendar

STF Process calendar

The ETSI budget is allocated by the ETSI Board.

ETSI STF budget 2021 Allocation

The calendar of the ETSI STF FWP Budget 2021 :

ETSI STF budget 2021 Allocation calendar

Until

Collect draft ToR from Reference Bodies (RB)

24 August 2020

download Template with instructions

 

send draft to FA/STF Manager: youssouf.sakho@etsi.org

25 August -11 September 2020 

Consistency check between ETSI Secretariat and RB

 

Full ToR available(RB approved or possibility to get the approval in parallel to this budget allocation)

22 September 2020 (Afternoon) 

Board#129 approval during the afternoon session dedicated to STF/TTF review

  

 

 

 

 

 

 

 

 

 

Guidelines

If the request concerns the continuation of an existing STF activity, the Reference Body (RB) must provide an overview of the results achieved and resources spent by the previous STFs in this domain.

The ToR must provide a detailed description of the work to be done and an accurate estimate of the maximum budget required to perform the work.

The ETSI Secretariat will make a consistency check of the STF request and may come back to the RB Chairman with comments and/or proposals to improve the ToR and/or the presentation of the business case to the OCG/Board.  If it is not possible to achieve an agreement on the consistency check, the document will be submitted to the OCG/Board consultation according to the instruction of the RB Chairman but with comments from the Secretariat.

The STF requests must be approved by the Reference Body before being submitted to the OCG/Board. 

Given the time constraints if the draft ToR have not  been approved by the Reference Body before the submission of the proposal, then the approval calendar must be identified in the ToR.