Testing Task Force T009:
NG112 Advanced Conformance Test Specification Development

Who we are:

 

Team leader:
Team Members:

What we do

The objective of the TTF T009 is to reassess the existing TTCN conformance test cases based on the newly released TS 103 479 and the current TTCN Titan Release 7.1. Additionally, advanced test specifications shall be developed and implemented.
  • The following interfaces shall be considered
    • LIS interface via HELD or SIP
    • ECRF interface via LOST
    • PSAP interface via SIP, HTTP
    • ESRP interface via SIP, HTTP
    • BCF interface via SIP, HTTP
  • Systems Under Test (SUTs)
    • LIS
    • ECRF
    • ESRP
    • PSAP
    • BCF
  • Collect Test requirements
  • Validate the test suite before and during the next NG112 Plugtests event
It is the intent that the TTF will update the existing test descriptions in machine readable language and add new test descriptions when new requirements are introduced in the base specifications.
In addition, the TTF will develop test descriptions for TS 103 625, Emergency Communications (EMTEL); Transporting Handset Location to PSAPs for Emergency Calls - Advanced Mobile Location.

For more details, see our Terms of Reference

Why we do it

NG112 equipment is currently being deployed in national and international trials with the progression towards fully operational deployment. Thorough conformance testing will increase the level of confidence that equipment from various suppliers will interoperate. This in turn will reduce implementation and rollout times and costs. Not providing timely validated and reliable test specifications, would ultimately delay the deployment of NG112 services. This may be paired with a loss of confidence in NG112 as there is a risk that early implementations of NG112 core services are not standard conform or interoperable as expected and serious rework may be needed to solve that.

How we do it

The leading body is TC EMTEL, any reports, drafts and final deliverables are discussed with and presented to TC EMTEL. 

Deliverables


RTS/EMTEL-00060-1 Revision of ETSI TS 103 650-1 V1.1.1 (2020-01)
EMTEL; Testing - Conformance test specifications for core elements for network independent access to emergency services (NG112);
Part 1: Protocol Implementation Conformance Statement (PICS), Test Suite Structure and Test Purposes (TSS & TP)
2022-06-30
RTS/EMTEL-00060-2 Revision of ETSI TS 103 650-2 V1.1.1 (2020-01)
EMTEL; Testing - Conformance test specifications for core elements for network independent access to emergency services (NG112);
Part 2: Abstract Test Suite (ATS) and Protocol Implementation eXtra Information for Testing (PIXIT)
2022-06-30
DTS/EMTEL-00062 EMTEL; Testing - Conformance test specifications for Advanced Mobile Location; Test Purposes (TP) for the handsets 2022-02-28

Time plan

Task / Milestone                                                                                             Target Date
        From...To      
Start of work  
 TTF Leadership/Project Management
2021-07 - 2022-06
Reassessment of existing TTCN Code 2021-07 - 2021-08
Development of AML Test Descriptions for the handsets 2021-07 - 2021-08
Development of Advanced Test Descriptions 2021-07 - 2021-08
Stable draft of AML Test Descriptions for the handsets
Early draft of advanced test descriptions
Progress report#1 reporting on Tasks 1, 2 and 3 approved by TC EMTEL
To 2021-08-31
Development of Advanced Test Descriptions 2021-08 - 2021-12
Implementation of Advanced Test Descriptions 2021-09 - 2021-12
TB Approval of AML Test Descriptions for the handsets
Stable draft of advanced test descriptions,
Early draft of test cases implementation
Progress report#2 reporting on Tasks 3 and 4 approved by TC EMTEL
To 2021-12-01
Implementation of Advanced Test Descriptions 2021-12 - 2022-03
Stable draft of test cases implementation
Progress Report#3 reporting on Task 4 approved by TC EMTEL
To 2022-03-01
Evaluation before and during Plugtests 2022-03 - 2022-05
Final Report, final drafts approved by TC EMTEL To 2022-05-31
Publication of Deliverables
TTF Closed
To 2022-06-30

How to contact us

Please contact us via email.

This information is based upon STF working assumptions.

The views expressed do not necessarily represent the position of ETSI in this context.