STFbreadcrumb separatorSTFsbreadcrumb separatorSTF Homepagesbreadcrumb separatorSTF332

Specialist Task Force 332: Plugtests & Protocol Modelling to verify Coexistence Mechanism
for PLT Modems and coexistence between PLT Modems and
fixed Short Wave Radio broadcasting services

Who we are:

Team Leader: Andreas Schwager
Team Members: Michael Hate
Holger Hirsch
Roger Pfister

What we do :

ETSI Technical Committee Power-Line Telecommunications (TC PLT) is developing standards for networks, their elements and interfaces for digital communication on electrical wires.

TC PLT will progress the necessary ETSI deliverables to cover the provision of multimedia and/or voice and/or data communications over power lines.

The current market is fragmented with proprietary systems that may produce interoperability and mutual co-existence problems for new as well as existing PLT devices.

Draft TS of Work Item 20 (WI20) deals with coexistence of a PLT system with other PLT systems and draft TS of Work Item 21 (WI21) deals with coexistence with short wave radio services including DRM (Digital Radio Mondiale). These two standards will be developed in sufficient detail to allow coexistence between equipment from different vendors and applications.

PlugtestsTM are essential to achieve a common understanding of coexistence issues that affect Powerline telecommunications at MAC & PHY level. Protocol modelling and simulation will ensure the efficacy of the TS and will assist PLT system engineers to produce implementations that will achieve compliance with the TS and give a higher probability of success when different systems are tested together at the PlugtestsTM. For the realisation of a PlugtestsTM of WI20, at least two different implementations using the draft TS will be needed. With this condition, the coexistence mechanism between PLT modems can be identified as feasible to be implemented and adopted by different vendors.

To resolve this issue and agree upon a common understanding of factors that affect coexistence of Powerline Telecommunications at MAC & PHY level a Protocol Model and Simulation is necessary in order to highlight any particular areas of implementation difficulty or performance prior to the costly and time consuming effort of implementation and to ensure that PLC technology providers bring to the PlugtestsTM implementations that are capable of meeting the TS. Furthermore PlugtestsTM are required to verify the draft TS of Work Items 20 and 21.

During the coexistence PlugtestsTM, different PLT modems from different vendors implementing draft TS related to WI20 and/or draft TS related to WI21 will be evaluated. The comparison of the behaviour of the PLT modems and the evaluation of the mechanism implemented based on the drafts TS will be done by an independent expert. Independence is essential in order to ensure neutrality in the realisation of the tests and the evaluation of the results.

The STF will verify the performance of the coexistence implementations and will make recommendations for possible improvement of today’s draft TS of Work Item 20 (WI20) and 21(WI21).

The STF is expected to finish the work with draft reports, one for each Work Item, ready for TC approval.

Read our Terms of Reference

Why we do it:

This proposed STF is needed for a twofold purpose:

  • To develop a PLT coexistence PHY and MAC Protocol Model and Simulation based on the work in WI20. This Protocol Model and Simulation will be used to verify the results of a PlugtestsTM event that will provide essential feedback to WI20.
     
  • And to realise a PlugtestsTM event (maybe coinciding with the previous) to provide essential feedback to WI21 of ETSI PLT. During the development of WI21 draft specification 9 members commented using the TB decision support tool that this PlugtestsTM is required to verify it. 

Time plan for the work:

The STF will produce the following deliverables, for TC PLT approval:

DTR/PLT-00022 (approved by PLT#42 PLT#42TD17r1, for WI20)

Title:     Modelling and Simulation of the Coexistence Protocol between PLT modem systems

Scope:  Results and verification of the Modelling and Simulation of coexistence between PLT modem system.

DTR/PLT-00023 (approved by PLT#42 PLT#42TD15r1, for WI20)

Title:     Report from PlugtestsTM 2007 on coexistence between PLT modem systems

Scope:  Results of the verification of the proposed mechanism to improve coexistence between PLT modem systems.

DTR/PLT-00024 (approved by PLT#42 PLT#42TD16r1, for WI21)

Title:     Report from PlugtestsTM 2007 on coexistence between PLT and short wave radio broadcast

Scope:  Results of the verification of the proposed mechanism to improve coexistence between PLT and short wave radio broadcast.

The STF will produce the deliverables according to the following time scale:

  • Start of the work                                             15 Aug 2007
  • ToC, scope and first draft (PLT#44)                   15 Nov 2007
  • Final draft for TB approval                                 15 Jan 2008
  • TB approval (PLT#45)                                      31 Jan 2008
  • Publication                                                     01 Mar 2008 

How to contact us:

If you would like more information, please contact the STF Leader, Andreas Schwager schwager@sony.de
 

Note: this information is based upon STF working assumptions. The views expressed do not necessarily represent the position of ETSI in this context.

Last updated: 2013-04-13 17:30:56