Specialist Task Force 447:
GeoNetworking media-dependent functionality for
ITS-G5
Who we are:
Team Leader: Jan de Jongh, TNO,
jan.dejongh@tno.nl
Team Members: Jérôme Haerri, Eurecom,
jerome.haerri@eurecom.net
Katrin Sjöberg, Volvo,
katrin.sjoberg@volvo.com
Dieter Smely, Kapsch,
dieter.smely@kapsch.net
Tessa Tielert, KIT,
tessa.tielert@kit.edu
What we do:
The proposed action of the STF aims at the development of the standard for
GeoNetworking media-dependent functioning for ITS G5 (TS 102 636-4-2) and will
provide recommendations (change requests) to other standards. For the ETSI TS
102 636-4-2 standard development, the work includes in particular the
specification of network-layer DCC and network-layer support for multi-channel
operation of ITS-G5. For the recommendations/change request, the action should
develop suggestions for other standards developed in TC ITS WGs 2, 3 and 4 in
order to resolve dependencies of these standards with the GeoNetworking
standards series.
For more details, see our
Terms of Reference
Why we do it:
The
proposed action will allow the finalization of the last critical part of the
relevant series of standards for GeoNetworking and is an important part to
successfully execute the mandate M/453 and improve the overall set of standards
developed by ETSI TC ITS. The overall GeoNetworking series represents the major
part of the standards for the ITS Network and Transport Layer and is an
important step towards the finalisation of the overall minimum set of
standards..
The
proposed action will complete the series of networking and transport protocols
for ad hoc communication with ITS-G5. The completion of the series is a
requirement for the deployment and market introduction of the system.
ETSI TC ITS:
The tasks will be executed by TC ITS (Intelligent Transport Systems), which is
the ETSI lead technical body. TC ITS is responsible for the development and
maintenance of the standards, specifications and other deliverables to support
the development and implementation of ITS Service provision across the network,
for transport networks, vehicles and transport users, including interface
aspects and multiple modes of transport and interoperability between systems,
but not including ITS application standards, radio matters, and EMC.
ETSI
Clusters:
Recently ETSI
has created Technology Clusters to group standardisation work around a set of
technology domains such as Internet of Things, Transport, Wireless Technologies,
etc. Each cluster groups the relevant ETSI Technical Bodies with related
Standards Partners (including Fora), research partners and applicable mandates.
It summarises the current (standardisation) work, but also identifies new areas
of work and activities. The intention is to enable collaborative efforts within
clusters as well as across clusters. They are also a valuable dissemination tool
to identify the key areas of ETSI standardisation. This project will liaise with
the Transport Cluster.
FP7 Projects:
This project will take into consideration the result of completed EC projects
FP7 GeoNet, InterSafe-II, PRE-DRIVE C2X. It will work closely with the EC
projects ecoMove and DRIVE C2X. The cooperation with the field trial project
DRIVE C2X is particularly important as it prepares and conducts Field-Operational
Tests (FOTs) on cooperative systems and is associated with various national
field test projects across Europe, such as simTD in Germany, SCOREF in France,
and also in Italy, Spain, Sweden and Finland.
How we do it:
The work
will be carried out by an ETSI Specialist Task Force (STF) under the
responsibility of TC ITS.
The TC ITS
Chairman and TC ITS/WG 3 Chairman will monitor the progress of the day-to-day
work and no steering committee is planned other than the TC ITS plenary meetings
and the specific TC ITS/WG3 meetings.
The work
will be undertaken both at joint meetings (mostly in Sophia Antipolis at ETSI
headquarters) and by teleconferences / Skype session support.
The STF
will be supported by a number of ETSI members who are prepared to voluntarily
contribute to the drafting of the technical report as well as performing reviews
of the STF deliverables for approval in the working group and technical body.
The STF
will report to ETSI TC ITS/WG3 (generally by conference call / e-mail but with
physical meetings being held in conjunction with some ETSI TC ITS/ WG3 meetings,
and, most importantly, ETSI TC ITS Plenary meetings).
In order to
achieve its goals, STF447 is equipped with the combined expertise on
- Networking
and transport protocols, in particular ad hoc networking and specifically
GeoNetworking,
- IEEE 802.11
standards and its ITS-specific extensions for DCC and multi-channel operation,
- Wireless and
mobile communication systems and protocols,
- ITS
architecture and cross-layer optimization,
- General ITS
standardization,
- European
projects on cooperative ITS.
Deliverables:
The
proposed action has two main deliverables:
- To produce
one base standard in the GeoNetworking standard series, i.e. the media-dependent
functionality of GeoNetworking for ITS-G5, ETSI TS 102 636-4-2.
- To analyze other standards of the Minimum Set of Standards in M/453, which have
interdependencies with the GeoNetworking standards series and develop
recommendations (change requests) in order to resolve the dependencies among
these standards.
Time plan:
For
STF447, the following Work-Breakdown Structure applies:
-
Task 1:
Establish the STF project
- Task 2: Start of work and development of Table of Content and Scope
- Task 3: Network-layer congestion control (31 October)
- Task 4: Preliminary draft #1 TS 102 636-4-2 in WG3 (30 November)
-
Task 5: Network-layer multi-channel operation support (28 February 2013)
- Task 6: Preliminary draft #2 TS 102 636-4-2 in WG3 (31 March 2013)
- Task 7: Recommendations for other standards (Phase 1) (28 February 2013)
- Task 8: Interim report to the EC / EFTA (31 March 2013)
- Task 9: Completion of TS 102 636-4-2 (31 May 2013)
- Task 10: Stable draft of TS 102 636-4-2 in WG3 (31 July 2013)
- Task 11: Final draft of TS 102 636-4-2 for TB approval (31 August 2013)
- Task 12: Publication of TS 102 636-4-2 (31 October 2013)
- Task 13: Recommendations for other standards (Phase 2) (31 October 2013)
- Task 14: Final report to EC/EFTA (31 October 2013)
- Task 15: General management of STF (continuous)
The STF leader will manage the STF, prepare reports, organize working sessions
and meetings, liaise with WG3, etc. in agreement with the ITS/WG3 chairman.
How to contact us:
E-mail:
STF447_ITS_GN_DCC@LIST.ETSI.ORG
This information is based upon STF working assumptions.
The views expressed do not necessarily represent the position of ETSI in this
context.
Last updated: 2012-10-10 14:53:42