| Work item number | Version | Current status | Next status | Rapporteur name | ||
|---|---|---|---|---|---|---|
| F5G | ||||||
| DGS/F5G-0025 (GS F5G 025) Architecture of computing collaboration in PON network | ![]() | 0.0.6 | Early draft (2025-02-26) | Stable draft | SUN YUE | |
| DGS/F5G-0037 (GS ) RFID over FTTR Arch | 0.0.1 | Early draft (2025-11-12) | Stable draft | Li Junwei | ||
| DGS/F5G-0038 (GS ) Framework and YANG modules in PON based Industrial Network | 0.0.2 | Early draft (2026-05-20) | Stable draft | Tang Jian | ||
| DGR/F5G-0039 (GR ) F5G-Advanced Use Cases Release 5 | Start of work (2025-09-18) | Early draft | SUN YUE | |||
| DGS/F5G-0040 (GS ) Technical requirements for FTTR Network deployment | 0.0.2 | Early draft (2026-05-21) | Stable draft | Guo Chunxia | ||
| DGS/F5G-0042 (GS ) low latency PON | 0.0.4 | Early draft (2026-06-09) | Stable draft | Jin Jialiang | ||
| DGR/F5G-0043 (GR ) Green F5G-A | 0.0.2 | Early draft (2026-02-05) | Stable draft | Ferveur Olivier | ||
| DGS/F5G-0044 (GS ) Ultra-Reliable WSON | Start of work (2025-11-13) | Early draft | LIU YUYANG | |||
| DGS/F5G-0045 (GS ) Req and Gap Analyses Rel 5 | Start of work (2026-03-31) | Early draft | Lv Zhihua | |||
| DGS/F5G-0046 (GS ) F5G-A Arch Rel 5 | 0.0.1 | Early draft (2026-05-21) | Stable draft | LIU YUYANG | ||
| F5G TEST | ||||||
| DGS/F5G-0035 (GS ) Test Specification for fgOTN Functionality and Performance | 0.0.6 | Stable draft (2026-06-11) | Final draft | Liu Sheng | ||
| DGR/F5G-0041 (GR ) F5G-A Methodology for Hybrid Measurement and Simulation of FTTR | 0.0.2 | Early draft (2026-05-19) | Stable draft | Bagheriasl Rudy | ||
| DGS/F5G-0047 (GS ) F5G-A Test Specification for PON based Industrial Network | Work item adopted (2026-05-20) | Start of work | CAO XIAOBO | |||
| DGS/F5G-0048 (GS ) F5G-A Test for FTTR-SME | Work item adopted (2026-05-20) | Start of work | Shi Hang | |||
| Other WI reports | Previous | Next | Full Search |