2026-06-05 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGR/MEC-0001v411-Terms' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGR/MEC-0001v411-Terms (PDF Format) Download standrd ref:
RGR/MEC-0001v411-Terms (Word Format)
  RGR/MEC-0001v411-Terms GR MEC 001   MEC
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2026-06-01) 4.1.1 2026-06-01   2025-09-10
  Rapporteur Technical Officer Harmonised Standard
  Alice Li Chantal Bonardi No
 
Title Multi-access Edge Computing (MEC); Terminology
Terminology 
Scope and Field
of Application
This Work Item addresses the necessary changes to align the MEC glossary to the changes coming from other MEC specifications.  
Supporting
Organizations
FSCOM, China Telecommunications, Huawei Tech.(UK) Co.. Ltd, Apple France, xFlow Research Inc. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  acronym
MEC
terminology
  Networks
     
Official Journal
     
Remarks
2026-05-12 korycinska Final draft endorsed by the Technical Gr proposal in contribution MEC(26)000071 was Accepted by MEC (see RC MEC(26)DEC378)
2026-04-23 bonardi Draft contributed - V 4.0.4 contributed for Decision in MEC(26)000071 as Final draft
2026-04-23 bonardi A new draft is uploaded - V 4.0.4 with status: Final draft for approval
2026-04-23 bonardi Final draft proposal in contribution MEC(26)000066 was Noted by MEC (see RC MEC(26)DIS377)
2026-04-01 bonardi Stable draft proposal in contribution MEC(26)000054 was Noted by MEC
2026-04-01 bonardi Draft contributed - V 4.0.3 contributed for Discussion in MEC(26)000066 as Final draft
2026-04-01 bonardi A new draft is uploaded - V 4.0.3 with status: Final draft for approval
2026-03-24 lialia Status updated - V 4.0.2 with status: Stable draft
2026-03-09 lialia Draft contributed - V 4.0.2 contributed for Information in MEC(26)000054 as Early draft
2026-03-09 lialia A new draft is uploaded - V 4.0.2 with status: Early draft
2025-12-08 bonardi Early draft proposal in contribution MEC(25)000424 was Noted by MEC
2025-12-02 lialia Draft contributed - V 4.0.1 contributed for Information in MEC(25)000424 as Early draft
2025-12-02 lialia A new draft is uploaded - V 4.0.1 with status: Early draft - with comment: Base line for phase 4
2025-09-11 Chantal Bonardi Work item adopted MEC, see contribution MEC(25)000359r1
2025-09-11 Chantal Bonardi WI noted by TB MEC, see contribution MEC(25)000359
2025-09-11 lialia WI proposed to TB MEC, see contribution MEC(25)000359r1
2025-09-10 lialia WI proposed to TB MEC, see contribution MEC(25)000359
 

ETSI Home Page Any comments or problems with this application? Please let us know...