2026-06-04 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTR/ATTM-0259' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTR/ATTM-0259 (PDF Format) Download standrd ref:
DTR/ATTM-0259 (Word Format)
  DTR/ATTM-0259 TR 104 125   ATTM AT2
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2026-05-06) 1.1.1 2026-05-06 View Standstill Information 2024-10-23
  Rapporteur Technical Officer Harmonised Standard
  Zhaozheng Yu Helene Schmidt No
 
Title Access, Terminals, Transmission and Multiplexing (ATTM); Deployment of indoor cabling system based on invisible optical cables
Indoor cabling system based on invisible optic cables 
Scope and Field
of Application
The present document describes the structure of indoor cabling system based on invisible optical cables, main components and attachments and their characteristics, deployment method, and installation details. 
Supporting
Organizations
Orange, Huawei Tech.(UK) Co.. Ltd, Huawei Technologies France, Association eG4U 

 

Keywords Projects Clusters Frequencies Mandates Directives
  CABLE
FIBRE
  Better Living with ICT
Connecting Things
Content delivery
Home & Office
Interoperability
Networks
     
Official Journal
     
Remarks
2026-03-31 schmidth Technical Group Approval proposal in contribution ATTM(26)000007 was Accepted by ATTM (see RC ATTM(26)DEC247)
2026-03-18 schmidth Draft contributed - V 0.0.3 contributed for Decision in ATTM(26)000007 as Working Group Endorsement
2026-03-18 schmidth Working Group Endorsement proposal in contribution ATTMAT2(26)000001 was Accepted by ATTM AT2 (see RC ATTMAT2(26)DEC055)
2026-03-09 schmidth Draft contributed - V 0.0.3 contributed for Decision in ATTMAT2(26)000001 as Final draft
2026-03-02 schmidth A new draft is uploaded - V 0.0.3 with status: Final draft for approval
2025-10-23 schmidth A new draft is uploaded - V 0.0.2 with status: Stable draft
2025-04-08 bouffant Draft contributed - V 0.0.1 contributed for Discussion in ATTMAT2(25)84008 as Early draft
2025-03-31 schmidth A new draft is uploaded - V 0.0.1 with status: Early draft
2024-12-12 Dominique Roche Work Item Adoption ATTM, see contribution ATTM(24)000014 in RC ATTM(24)DEC215
2024-11-25 SCHMIDTH WI proposed to WG ATTM AT2, see contribution ATTM(24)000014
2024-11-25 Helene Schmidt WI accepted by WG ATTM AT2, see contribution ATTMAT2(24)083005 in RC ATTMAT2(24)DEC051
2024-10-23 zhangge1 WI proposed to WG ATTM AT2, see contribution ATTMAT2(24)083005
 

ETSI Home Page Any comments or problems with this application? Please let us know...