2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTS/INT-00159-3' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTS/INT-00159-3 (PDF Format) Download standrd ref:
DTS/INT-00159-3 (Word Format) Download standrd ref:
DTS/INT-00159-3 (Zip Format)
  DTS/INT-00159-3 TS 103 653-3 574 INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2020-08-04) 1.1.1 2020-08-04 View Standstill Information 2018-12-04
  Rapporteur Technical Officer Harmonised Standard
  Bostjan Pintar Emmanuelle Chaulot-Talmon No
 
Title Core Network and Interoperability Testing (INT); VoLTE/ViLTE interoperability test description over 4G/early 5G in physical/virtual environments; (3GPP™ Release 15); Part 3: Abstract Test Suit (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) for VoLTE/ViLTE interoperability
ATS&PIXIT for VoLTE/ViLTE interoperability 
Scope and Field
of Application
VoLTE/ViLTE interoperability test descriptions cover the test scenarios within single-network configuration over 4G/early 5G in physical/virtual environments, as well as interconnect and roaming test scenarios within multiple-network configurations. Test descriptions provide monitoring points and test specifications in prose details with focus on different interworking and interoperability interfaces using SIP, Diameter protocols and checks of ENUM Transactions. 
Supporting
Organizations
TELECOM ITALIA S.p.A., Deutsche Telekom AG, Iskratel d.o.o. Ltd, Fraunhofer FOKUS, Mesaqin.com s.r.o (Ltd.), Sintesio, Foundation 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ATS
INTEROPERABILITY
PIXIT
ViLTE
VoLTE
3GPP-Release-15
Interoperability
     
Official Journal
     
Remarks
2020-06-30 chaulottalmo Final draft for approval proposal in contribution INT(20)046011r2 was Accepted by INT
2020-06-29 schmitting Draft contributed - V 0.0.11 contributed for Decision in INT(20)046011r2 as Final draft for approval
2020-06-29 schmitting Final draft for approval proposal in contribution INT(20)046011r1 was Revised by INT
2020-06-29 schmitting A new draft is uploaded - V 0.0.11 with status: Final draft for approval
2020-06-26 schmitting Draft contributed - V 0.0.10 contributed for Decision in INT(20)046011r1 as Final draft for approval
2020-06-26 schmitting Final draft for approval proposal in contribution INT(20)046011 was Revised by INT
2020-06-26 schmitting A new draft is uploaded - V 0.0.10 with status: Final draft for approval
2020-06-19 schmitting Draft contributed - V 0.0.9 contributed for Decision in INT(20)046011 as Final draft for approval
2020-06-19 schmitting A new draft is uploaded - V 0.0.9 with status: Final draft for approval
2020-03-03 schmitting Draft contributed - V 0.0.4 contributed for Discussion in INT(20)045013 as Stable draft
2020-03-03 schmitting A new draft is uploaded - V 0.0.4 with status: Stable draft
2019-11-08 schmitting Draft contributed - V 0.0.2 contributed for Discussion in INT(19)044011 as Early draft
2019-06-03 schmitting A new draft is uploaded - V 0.0.2 with status: Early draft
2019-06-03 schmitting A new draft is uploaded - V 0.0.1 with status: Early draft
2018-12-04 PINTAR TB adoption of WI INT, see contribution INT(18)041029
2018-12-04 PINTAR WI proposed to TB INT, see contribution INT(18)041029
 

Specific aspects
  User/consumer aspects

ETSI Home Page Any comments or problems with this application? Please let us know...