2024-05-02 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
Work Item Progress Report: All Active Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing' Matching One of The Keywords 'WCDMA'
View As Work Item Summary List  |  View As Work Item Plan    
Legend:   On Time   Late
  Found 5 Items...
Displaying items 1 to 5 ...
 
  Work Item Title Current Status Planned Next Status Planned Procedure
MSG TFES
1. EN 302 480
REN/MSG-TFES-1138
Mobile Communication On Board Aircraft (MCOBA) systems;
Harmonised Standard for access to radio spectrum
MCOBA/NCU 5G-NR HS
2023-11-13
Suspend work
2024-05-15
Resume work
2024-06-18
AP
2. EN 301 908-18
REN/MSG-TFES-1502
IMT cellular networks;
Harmonised Standard for access to radio spectrum;
Part 18: NR, E-UTRA, UTRA and GSM/EDGE Multi-Standard Radio (MSR) Base Station (BS) Release 17
3GPP Rel-17 update
2024-03-28
Stable draft
2024-06-24
Mature draft sent to EC and/or recog.Org
2024-10-19
AP
ERM WGEMC
3. EN 301 489-52
REN/ERM-EMC-420
ElectroMagnetic Compatibility (EMC) standard for radio equipment and services;
Part 52: Specific conditions for Cellular Communication User Equipment (UE) radio and ancillary equipment;
Harmonised Standard for ElectroMagnetic Compatibility
EMC for User Equipment
2024-04-10
EC Assessment Received

Final draft for approval
2024-10-28
AP
4. EN 301 489-50
REN/ERM-EMC-410
ElectroMagnetic Compatibility (EMC) standard for radio equipment and services;
Part 50: Specific conditions for Cellular Communication Base Station (BS), repeater and ancillary equipment;
Harmonised Standard for ElectroMagnetic Compatibility
EMC for Cellular Communication BS, repeater and ancillary equipment
2024-02-20
Stable draft
2023-10-13
Mature draft sent to EC and/or recog.Org
2024-03-27
AP
EE EEPS
5. ES 202 706-1
RES/EE-EEPS70
Environmental Engineering (EE);
Metrics and measurement method for energy efficiency of wireless access network equipment;
Part 1: Power consumption - static measurement method
Energy efficiency of wireless access network equipment -Static
2024-04-27
Final draft for approval
2024-06-21
TB approval
2024-07-19
MV
  Found 5 Items...
Displaying items 1 to 5 ...
 
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...