2024-05-04 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
Work Item Progress Report: All Active Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing' Matching One of The Keywords 'LTE' with 'LTE' in Title
View As Work Item Summary List  |  View As Work Item Plan    
Legend:   On Time   Late
  Found 729 Items...
Displaying items 1 to 10 ...
  Work Item Title Current Status Planned Next Status Planned Procedure
3GPP RAN 5
1. TS 138 523-3
RTS/TSGR-0538523-3vha0
LTE; 5G;
5GS; User Equipment (UE) conformance specification; Part 3: Protocol Test Suites
(3GPP TS 38.523-3 version 17.10.0 Release 17)
5GS; User Equipment (UE) conformance specification; Part 3: Protocol Test Suites
2024-03-21
TB approval

Draft receipt by ETSI Secretariat

PU
2. TS 138 523-2
RTS/TSGR-0538523-2vh61
LTE; 5G;
5GS; User Equipment (UE) conformance specification; Part 2: Applicability of protocol test cases
(3GPP TS 38.523-2 version 17.6.1 Release 17)
5GS; User Equipment (UE) conformance specification; Part 2: Applicability of protocol test cases
2024-03-21
TB approval

Draft receipt by ETSI Secretariat

PU
3. TS 138 523-1
RTS/TSGR-0538523-1vh60
LTE; 5G;
5GS; User Equipment (UE) conformance specification; Part 1: Protocol
(3GPP TS 38.523-1 version 17.6.0 Release 17)
5GS; User Equipment (UE) conformance specification; Part 1: Protocol
2024-03-21
TB approval

Draft receipt by ETSI Secretariat

PU
4. TS 138 509
RTS/TSGR-0538509vh50
LTE; 5G;
5GS; Special conformance testing functions for User Equipment (UE)
(3GPP TS 38.509 version 17.5.0 Release 17)
5GS; Special conformance testing functions for User Equipment (UE)
2024-03-21
TB approval

Draft receipt by ETSI Secretariat

PU
5. TS 138 508-2
RTS/TSGR-0538508-2vi20
LTE; 5G;
5GS; User Equipment (UE) conformance specification; Part 2: Common Implementation Conformance Statement (ICS) proforma
(3GPP TS 38.508-2 version 18.2.0 Release 18)
5GS; User Equipment (UE) conformance specification; Part 2: Common Implementation Conformance Statem
2024-03-21
TB approval

Draft receipt by ETSI Secretariat

PU
6. TS 138 508-1
RTS/TSGR-0538508-1vi20
LTE; 5G;
5GS; User Equipment (UE) conformance specification; Part 1: Common test environment
(3GPP TS 38.508-1 version 18.2.0 Release 18)
5GS; User Equipment (UE) conformance specification; Part 1: Common test environment
2024-03-21
TB approval

Draft receipt by ETSI Secretariat

PU
3GPP RAN 1
7. TR 137 985
RTR/TSGR-0137985vi00
LTE; 5G;
Overall description of Radio Access Network (RAN) aspects for Vehicle-to-everything (V2X) based on LTE and NR
(3GPP TR 37.985 version 18.0.0 Release 18)
Overall description of Radio Access Network (RAN) aspects for Vehicle-to-everything (V2X) based on L
2023-12-15
TB approval

Draft receipt by ETSI Secretariat

PU
3GPP RAN 4
8. TR 137 977
RTR/TSGR-0437977vi00
Universal Mobile Telecommunications System (UMTS); LTE;
Universal Terrestrial Radio Access (UTRA) and Evolved Universal Terrestrial Radio Access (E-UTRA); Verification of radiated multi-antenna reception performance of User Equipment (UE)
(3GPP TR 37.977 version 18.0.0 Release 18)
Universal Terrestrial Radio Access (UTRA) and Evolved Universal Terrestrial Radio Access (E-UTRA); V
2024-03-22
TB approval

Draft receipt by ETSI Secretariat

PU
9. TR 137 976
RTR/TSGR-0437976vi00
Universal Mobile Telecommunications System (UMTS); LTE;
Measurement of radiated performance for Multiple Input Multiple Output (MIMO) and multi-antenna reception for High Speed Packet Access (HSPA) and LTE terminals
(3GPP TR 37.976 version 18.0.0 Release 18)
Measurement of radiated performance for Multiple Input Multiple Output (MIMO) and multi-antenna rece
2024-03-22
TB approval

Draft receipt by ETSI Secretariat

PU
10. TR 137 941
RTR/TSGR-0437941vi00
Universal Mobile Telecommunications System (UMTS); LTE; 5G;
Radio Frequency (RF) conformance testing background for radiated Base Station (BS) requirements
(3GPP TR 37.941 version 18.0.0 Release 18)
Radio Frequency (RF) conformance testing background for radiated Base Station (BS) requirements
2024-03-22
TB approval

Draft receipt by ETSI Secretariat

PU
  Found 729 Items...
Displaying items 1 to 10 ...

Display Items/Page


Warning: Displaying 729 work items on one page might take a lot of time!
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...