2019-01-17 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
Work Item Progress Report: All Active new Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of TB approval process'
View As Work Item Summary List  |  View As Work Item Plan    
Legend:   On Time   Late
  Found 22 Items...
Displaying items 1 to 10 ...
  Work Item Title Current Status Planned Next Status Planned Procedure
NFV SOL
1. GS NFV-SOL 007
RGS/NFV-SOL007ed261
Network Functions Virtualisation (NFV) Release 2;
Protocols and Data Models;
Network Service Descriptor File Structure Specification
NSD file structure spec
2019-01-16
Early draft
2019-01-22
Stable draft
2019-05-11
PU
2. GS NFV-SOL 001
RGS/NFV-SOL001ed261
Network Functions Virtualisation (NFV) Release 2;
Protocols and Data Models;
NFV descriptors based on TOSCA specification
TOSCA-based NFV descriptors spec
2018-12-07
TB adoption of WI
2018-12-08
Start of work
2019-05-11
PU
NFV IFA
3. GR NFV-IFA 024
RGR/NFV-IFA024ed311
Network Function Virtualisation (NFV) Release 3;
Information Modeling;
Report on External Touchpoints related to NFV Information Model
NFV IM External touchpoints
2018-12-17
Early draft
2019-01-18
Stable draft
2019-04-01
PU
4. GR NFV-IFA 015
RGR/NFV-IFA015ed331
Network Functions Virtualisation (NFV) Release 3;
Management and Orchestration;
Report on NFV Information Model
Info Model Report
2018-12-20
TB adoption of WI
2019-04-01
Start of work
2019-09-15
PU
MTS
5. ES 201 873-6
RES/MTS-201873-6ed4.11.1
Methods for Testing and Specification (MTS);
The Testing and Test Control Notation version 3;
Part 6: TTCN-3 Control Interface (TCI)
TTCN-3 TCI V481
2019-01-09
TB adoption of WI
2017-12-07
Start of work
2019-02-27
MV
INT
6. TS 186 001-5
RTS/INT-00159
Core Network and Interoperability Testing (INT);
Network Integration Testing between SIP and ISDN/PSTN network signalling protocols;
Part 5: Test Suite Structure and Test Purposes (TSS&TP) for Network Integration Tests between ISDN-ISDN and ISDN-PSTN over SIP II NNI / SIP-I NNI
Network Integration Testing between ISDN-ISDN and ISDN-PSTN over over SIP II NNI / SIP-I NNI
2018-12-04
TB adoption of WI
2018-12-03
Start of work
2019-04-23
PU
RT
7. TR 103 554-1
RTR/RT-0051
Rail Telecommunications (RT);
Next Generation Communication System; Radio performance simulations and evaluations in rail environment;
Part 1: Long Term Evolution (LTE)
RT LTE simulations
2019-01-17
Start of work
2019-06-28
Early draft
2020-03-13
PU
CYBER
8. TS 103 523-3
RTS/CYBER-0027-3v121
CYBER;
Middlebox Security Protocol;
Part 3: Enterprise Transport Security
MSP for TLS at data centres
2019-01-17
TB adoption of WI
2019-01-16
Start of work
2019-03-18
PU
RT
9. TR 103 459
RTR/RT-0052
Rail Telecommunications (RT);
Future Rail Mobile Communication System (FRMCS);
Study on system architecture
FRMCS Architecture
2019-01-17
TB adoption of WI
2019-01-17
Start of work
2020-08-11
PU
BROADCAST
10. TS 103 270
RTS/JTC-DAB-94
RadioDNS Hybrid Radio;
Hybrid lookup for radio services
RadioDNS Hybrid Radio
2018-12-14
TB adoption of WI
2018-12-14
Start of work
2019-04-05
PU
  Found 22 Items...
Displaying items 1 to 10 ...

Display Items/Page


ETSI Home Page Any comments or problems with this application? Please let us know...