2026-11-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTR/DATA-00104648' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DTR/DATA-00104648 TR 104 648   DATA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Work item adopted (2026-09-08)     View Standstill Information 2026-09-07
  Rapporteur Technical Officer Harmonised Standard
  Enrico Scarrone Antoine Mouquet No
 
Title Data Solutions (DATA); oneM2M; Study on requirements for resilience and recovery
oneM2M - Study on requirements for resilience and recovery (WG INFO) 
Scope and Field
of Application
This TR derives and formally documents requirements for resilience and recovery based on the gaps identified in D1. Requirements cover the full scope of the resilience topic: mesh-based routing and failover, local node resource management, caching for continued operation during disconnection, self-healing procedures, and self-organising capabilities including semantic-aware route selection. Requirements are traced back to use cases and gaps from D1, validated for consistency and completeness, and expressed at a level of rigour suitable to directly drive the solution design in D3. Semantic information requirements are consolidated as a cross-cutting concern. 
Supporting
Organizations
TELECOM ITALIA S.p.A., Deutsche Telekom AG, Sejong University, JK Consulting and Projects, DIGITAL SME, Exacta Global Smart Solutions 

 

Keywords Projects Clusters Frequencies Mandates Directives
  IoT
oneM2M
  Connecting Things
     
Official Journal
     
Remarks
2026-09-08 Antoine Mouquet Work item adopted DATA, see contribution DATA(26)000112a2
2026-09-07 mouqueta WI proposed to TB DATA, see contribution DATA(26)000112a2
 

ETSI Home Page Any comments or problems with this application? Please let us know...