2026-06-09 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RES/EE-02113' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  RES/EE-02113 ES 203 474   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2026-05-31) 1.1.3 Draft     2025-06-24
  Rapporteur Technical Officer Harmonised Standard
  Lackis Eleftheriadis Laure Pourcin No
 
Title Environmental Engineering (EE); Interfacing of renewable energy or distributed power sources to 400 VDC distribution systems powering Information and Communication Technology (ICT) equipment
Coupling renewable energy to 400VDC systems (TA-ITU:L.1205) 
Scope and Field
of Application
Review and update Standard in line with current technologies 
Supporting
Organizations
Orange, Ericsson LM, BT plc, Huawei Technologies Italia 

 

Keywords Projects Clusters Frequencies Mandates Directives
  POWER SUPPLY
renewable
  Better Living with ICT
     
Official Journal
     
Remarks
2026-05-31 cookss Draft contributed - V 1.1.3 contributed for Discussion in EE2(26)1011 as Early draft
2026-05-31 eleftheriad A new draft is uploaded - V 1.1.3 with status: Early draft - with comment: Early draft for June meeting 2026
2025-06-26 Laure Pourcin Work item adopted EE, see contribution EE(25)067054
2025-06-24 cookss WI proposed to WG EE 02, see contribution EE(25)067054
2025-06-24 Simon Cook WI accepted by WG EE 02, see contribution EE2(25)67ee2009
2025-06-24 cookss WI proposed to WG EE 02, see contribution EE2(25)67ee2009
 

Specific aspects
  Environmental aspects

ETSI Home Page Any comments or problems with this application? Please let us know...