2026-06-13 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/ENI-0057v411_Req_IP_PP' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DGS/ENI-0057v411_Req_IP_PP GS ENI 057   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Stable draft (2025-12-12) 4.0.4 Draft   View Standstill Information 2025-03-10
  Rapporteur Technical Officer Harmonised Standard
  Jingyu Wang Christine Mera No
 
Title Experiential Networked Intelligence (ENI); Requirements for Intent Policy Pre-Processing
 
Scope and Field
of Application
The purpose of this work item is to refine and enhance clause 6.3.9.4 in ETSI GS ENI 005.
GS ENI 005 defines Intent Policy as “a type of policy that uses statements from a restricted natural language.” However, even a restricted natural language can still have ambiguity (e.g., words or phrases may have multiple interpretations, context-dependent meanings may not be fully captured, and implicit assumptions in the intent may not be clear). In addition, mapping high-level goals to specific network configurations, ensuring consistency across multiple translated policies, and resolving conflicts between different intent statements are still very challenging. Hence, there is an urgent need to specify how to ensure that any translated intent policy is acceptable and correct. In clause 6.3.9.4 of ETSI GS ENI 005, a unified architecture is introduced. This document will deliver deeper and provide technical specifications for pre-processing the intent policy.
This GS defines the parser from the aspects of architecture, working pipelines and AI model requirements in addition to the grammar of the external DSL. 
Supporting
Organizations
1.China Telecommunications 2.AsiaInfo 3.Futurewei 4.CAICT  

 

Keywords Projects Clusters Frequencies Mandates Directives
  Semantic
  Networks
     
Official Journal
     
Remarks
2026-05-21 forbesray Draft contributed - V 4.0.4 contributed for Information in ENI(26)38_019 as Stable draft
2026-02-23 forbesray Draft contributed - V 4.0.4 contributed for Information in ENI(26)37_021 as Stable draft
2025-12-12 libok Draft contributed - V 4.0.4 contributed for Decision in ENI(25)036_057 as Stable draft
2025-12-12   A new draft is uploaded - V 4.0.4 with status: Stable draft
2025-09-10 libok Draft contributed - V 4.0.2 contributed for Decision in ENI(25)035_046 as Early draft
2025-09-10   A new draft is uploaded - V 4.0.2 with status: Early draft - with comment: Update Clause 5
2025-06-13 forbesray Draft contributed - V 4.0.1 contributed for Information in ENI(25)000_154 as Early draft
2025-05-22 libok Draft contributed - V 4.0.1 contributed for Decision in ENI(25)034_013 as Early draft
2025-05-22   A new draft is uploaded - V 4.0.1 with status: Early draft - with comment: First Draft
 

ETSI Home Page Any comments or problems with this application? Please let us know...