2026-11-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/ERM-WG11-13' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  REN/ERM-WG11-13 EN 300 328   ERM WG11
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Stable draft (2026-10-09) 0.0.9 Draft 2025-01-08 View Standstill Information 2024-10-17
  Rapporteur Technical Officer Harmonised Standard
  Wilfrid D'Angelo Dimitra Papageorgopoulos Yes
 
Title Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz band; Harmonised Standard for access to radio spectrum
HS Wideband transmission systems 2,4 GHz 
Scope and Field
of Application
Revision to cover:
1. Provision for compliance with ECC Rec.(24)01 May 2024 on Receiver resilience
2. Update to Tx unwanted emission in the OOB domain clause according to ERC Rec. 74-01
3. Document structure overhaul and alignment with all latest EC guidance. 
Supporting
Organizations
BMWK, Bluetooth SIG Inc., Intel Corporation SAS, Qualcomm Technologies Int, Broadcom (EU) 

 

Keywords Projects Clusters Frequencies Mandates Directives
  BROADBAND
DATA
Harmonised standard
LAN
MOBILE
RADIO
REGULATION
SPREAD SPECTRUM
SRD
TESTING
TRANSMISSION
UHF
  Wireless Systems
Wideband Data Transmission Systems (2400 MHz to 2483,5 MHz)
M/536
2014/53/EU
Official Journal
     
Remarks
2026-10-09   A new draft is uploaded - V 0.0.9 with status: Stable draft - with comment: Adopted during WG11_70
2026-06-16   A new draft is uploaded - V 0.0.8 with status: Stable draft - with comment: As of end of WG11_69
2026-04-17   A new draft is uploaded - V 0.0.7 with status: Stable draft - with comment: As approved at end of WG11_68
2026-01-30   A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: Accepted in ERM TG11_67 202601
2025-11-14 DANGELOWIL A new draft is uploaded - V 0.0.5 with status: Early draft
2025-09-26 DANGELOWIL A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: As of end of TG11_65
2025-06-13 DANGELOWIL A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: As of end of TG11_64
2025-04-06 DANGELOWIL A new draft is uploaded - V 0.0.2 with status: Early draft
2025-02-06 DANGELOWIL A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: As of end of ERM TG11_62
2025-01-06 Holger Butscheidt Work Item Adoption ERM, see contribution ERM(24)84b011r1
2024-12-23 papageor WI proposed to WG ERM TG11, see contribution ERM(24)84b011r1
2024-12-20 Holger Butscheidt WI noted by TB ERM, see contribution ERM(24)84b011 in RC ERM(24)DEC1244
2024-12-04 papageor WI proposed to WG ERM TG11, see contribution ERM(24)84b011
2024-11-18 Wilfrid D'Angelo WI accepted by WG ERM TG11, see contribution ERMTG11(24)060005
2024-10-17 DANGELOW WI proposed to WG ERM TG11, see contribution ERMTG11(24)060005
 

ETSI Home Page Any comments or problems with this application? Please let us know...