2025-12-14 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/ISC-003' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DGR/ISC-003 GR ISC 003   ISAC
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Stable draft (2025-10-22) 0.0.9 Draft   View Standstill Information 2023-11-14
  Rapporteur Technical Officer Harmonised Standard
  Richard Stirling-gallacher Gabriele Perrone No
 
Title Integrated Sensing And Communications (ISAC); System and RAN Architectures
System and RAN Architectures for ISAC 
Scope and Field
of Application
The work item targets system and RAN architecture framework and definition for ISAC and will focus on the identified sensing types, integration levels and deployments towards 6G. The study will include the identification, considerations, and potential approaches around 6G ISAC system architectural issues, RAN architectural issues, and ISAC RAN challenges. 
Supporting
Organizations
Orange, ROBERT BOSCH GmbH, Samsung R&D Institute UK, TNO, CNIT, ZTE Corporation, Mitsubishi Electric RCE, NKUA, Vestel, Apple France, University of Oulu, UCL, HUAWEI TECH. GmbH, IMDEA Networks, LG Electronics UK, InterDigital, Europe, Ltd., UNIBO, UNIPI 

 

Keywords Projects Clusters Frequencies Mandates Directives
      Connecting Things
Wireless Systems
     
Official Journal
     
Remarks
2025-10-30 lorca Stable draft proposal in contribution ISC(25)000308 was Noted by ISAC
2025-10-30 lorca Stable draft proposal in contribution ISC(25)000298 was Noted by ISAC
2025-10-22 stirlinggal Draft contributed - V 0.0.9 contributed for Discussion in ISC(25)000308 as Stable draft
2025-10-22   A new draft is uploaded - V 0.0.9 with status: Stable draft
2025-10-16 stirlinggal Draft contributed - V 0.0.8 contributed for Discussion in ISC(25)000298 as Stable draft
2025-10-16   A new draft is uploaded - V 0.0.8 with status: Stable draft
2025-09-15 lorca Early draft proposal in contribution ISC(25)000246 was Noted by ISAC
2025-09-05 stirlinggal Draft contributed - V 0.0.7 contributed for Decision in ISC(25)000246 as Early draft
2025-09-05   A new draft is uploaded - V 0.0.7 with status: Early draft
2025-08-25 krause A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: ISC(25)000182
2025-08-25 krause A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: ISC(25)000146
2025-08-25 krause A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: ISC(25)000086
2025-08-25 krause A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: ISC(25)000059
2025-08-25 krause A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: ISC(25)000021
2024-10-21 aygul Draft contributed - V 0.0.1 contributed for Decision in ISC(24)000216 as Early draft
2024-09-20 lorca Early draft proposal in contribution ISC(24)000076r2 was Noted by ISAC
2024-09-12 aygul Draft contributed - V 0.0.1 contributed for Decision in ISC(24)000076r2 as Early draft
2024-07-12 lorca Early draft proposal in contribution ISC(24)000076r1 was Noted by ISAC
2024-07-04 aygul Draft contributed - V 0.0.1 contributed for Decision in ISC(24)000076r1 as Early draft
2024-07-02 aygul Early draft proposal in contribution ISC(24)000076 was Revised by ISAC
2024-05-02 ozbakis Draft contributed - V 0.0.1 contributed for Discussion in ISC(24)000076 as Early draft
2024-04-29   A new draft is uploaded - V 0.0.1 with status: Early draft
2023-12-20 Nicolae Madalin Neag TB adoption of WI ISAC, see contribution ISC(23)000012r3 in RC ISC(23)DEC004
2023-12-01 STIRLING WI proposed to TB ISAC, see contribution ISC(23)000012r3
2023-11-30 STIRLING WI proposed to TB ISAC, see contribution ISC(23)000012r2
2023-11-29 STIRLING WI proposed to TB ISAC, see contribution ISC(23)000012r1
2023-11-14 MOURADAL WI proposed to TB ISAC, see contribution ISC(23)000012
 

ETSI Home Page Any comments or problems with this application? Please let us know...