2025-12-14 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/ISC-002' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/ISC-002 (PDF Format) Download standrd ref:
DGR/ISC-002 (Word Format)
  DGR/ISC-002 GR ISC 002   ISAC
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Deliverable published (2025-08-05) 1.1.1 2025-08-05 View Standstill Information 2023-11-14
  Rapporteur Technical Officer Harmonised Standard
  Chuangxin Jiang Joern Krause No
 
Title Integrated Sensing And Communications (ISAC); Channel Modelling, Measurements and Evaluation Methodology
ISAC Channel Modeling, Measurements and Evaluation Methodology 
Scope and Field
of Application
The work item will for the identified 6G ISAC use cases and sensing types: (i) Develop advanced channel models and validation through extensive measurement campaigns and emulations, that can fill the gaps of existing channel models (e.g. 3GPP, IEEE 802, ITU-R); (ii) Define evaluation methodology framework and perform feasibility analysis of link budgets using the proposed channel models. 
Supporting
Organizations
ROHDE & SCHWARZ, Keysight Technologies UK Ltd, IMEC, ICS, Anritsu EMEA Ltd, Mitsubishi Electric RCE, NKUA, Vestel, Apple France, HUAWEI TECH. GmbH, LG Electronics Deutschland, InterDigital, Europe, Ltd., BJTU, UNIPI, GW 

 

Keywords Projects Clusters Frequencies Mandates Directives
  channel modelling
Evaluation
ISAC
Measurement
  Connecting Things
     
Official Journal
     
Remarks
2025-07-15 lorca Final draft for approval proposal in contribution ISC(25)000220 was Accepted by ISAC
2025-07-10 chuangxin Draft contributed - V 1.0.0 contributed for Decision in ISC(25)000220 as Final draft for approval
2025-07-10 chuangxin A new draft is uploaded - V 1.0.0 with status: Final draft for approval - with comment: Final draft
2025-07-08 chuangxin A new draft is uploaded - V 0.1.0 with status: Stable draft - with comment: the first stable draft
2025-06-27 lorca Early draft proposal in contribution ISC(25)000129 was Noted by ISAC
2025-06-16 chuangxin Draft contributed - V 0.0.12 contributed for Information in ISC(25)000129 as Early draft
2025-06-16 chuangxin A new draft is uploaded - V 0.0.12 with status: Early draft - with comment: Get edit help feedback based on verison 11
2025-05-28 lorca Early draft proposal in contribution ISC(25)000122 was Noted by ISAC
2025-05-15 chuangxin Draft contributed - V 0.0.11 contributed for Information in ISC(25)000122 as Early draft
2025-05-14 chuangxin A new draft is uploaded - V 0.0.11 with status: Early draft - with comment: only fixed format issues compared with version 10
2025-03-25 lorca Early draft proposal in contribution ISC(25)000048 was Noted by ISAC
2025-03-09 chuangxin Draft contributed - V 0.0.10 contributed for Discussion in ISC(25)000048 as Early draft
2025-03-09 chuangxin A new draft is uploaded - V 0.0.10 with status: Early draft - with comment: a new draft for step 2 with Micro-Deformation
2025-02-10 lorca Early draft proposal in contribution ISC(25)000041 was Noted by ISAC
2025-02-06 mouradalai Draft contributed - V 0.0.9 contributed for Discussion in ISC(25)000041 as Early draft
2025-02-06   A new draft is uploaded - V 0.0.9 with status: Early draft
2025-02-06 mouradalai Early draft proposal in contribution ISC(25)000008r4 was Revised by ISAC
2025-02-06 liujujunc Draft contributed - V 0.0.8 contributed for Discussion in ISC(25)000008r4 as Early draft
2025-02-06 liujujunc Early draft proposal in contribution ISC(25)000008r3 was Revised by ISAC
2025-02-06   A new draft is uploaded - V 0.0.8 with status: Early draft
2025-02-06 chuangxin Draft contributed - V 0.0.7 contributed for Discussion in ISC(25)000008r3 as Early draft
2025-02-06 chuangxin Early draft proposal in contribution ISC(25)000008r2 was Revised by ISAC
2025-02-06 chuangxin A new draft is uploaded - V 0.0.7 with status: Early draft
2025-02-06 chuangxin Draft contributed - V 0.0.6 contributed for Discussion in ISC(25)000008r2 as Early draft
2025-02-06 chuangxin Early draft proposal in contribution ISC(25)000008r1 was Revised by ISAC
2025-02-06 chuangxin A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: GR for step 1
2025-01-27 chuangxin Draft contributed - V 0.0.5 contributed for Discussion in ISC(25)000008r1 as Early draft
2025-01-27 chuangxin Early draft proposal in contribution ISC(25)000008 was Revised by ISAC
2025-01-27 chuangxin Draft contributed - V 0.0.4 contributed for Discussion in ISC(25)000008 as Early draft
2025-01-27 chuangxin A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Draft GR on ISAC Channel Modeling for Step 1
2025-01-02 lorca Early draft proposal in contribution ISC(24)000264 was Noted by ISAC
2024-12-07 chuangxin Draft contributed - V 0.0.4 contributed for Discussion in ISC(24)000264 as Early draft
2024-12-07 chuangxin A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: updated GR on ISAC channel modeling
2024-10-30 lorca Early draft proposal in contribution ISC(24)000219 was Noted by ISAC
2024-10-22 chuangxin Draft contributed - V 0.0.3 contributed for Discussion in ISC(24)000219 as Early draft
2024-10-20 chuangxin A new draft is uploaded - V 0.0.3 with status: Early draft
2024-09-20 lorca Early draft proposal in contribution ISC(24)000183r1 was Noted by ISAC
2024-09-13 gradoni Early draft proposal in contribution ISC(24)000204 was Withdrawn by ISAC
2024-09-12 gradoni Draft contributed - V 0.0.2 contributed for Discussion in ISC(24)000204 as Early draft
2024-09-12 gradoni Draft contributed - V 0.0.2 contributed for Discussion in ISC(24)000183r1 as Early draft
2024-09-12 gradoni Early draft proposal in contribution ISC(24)000183 was Revised by ISAC
2024-09-12   A new draft is uploaded - V 0.0.2 with status: Early draft
2024-09-12 gradoni Draft contributed - V 0.0.1 contributed for Discussion in ISC(24)000183 as Early draft
2024-09-09 chuangxin Status updated - V 0.0.1 with status: Early draft
2024-04-27 chuangxin A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: Early draft v001
2023-12-20 Nicolae Madalin Neag TB adoption of WI ISAC, see contribution ISC(23)000009r2 in RC ISC(23)DEC003
2023-12-01 CHUANGXI WI proposed to TB ISAC, see contribution ISC(23)000009r2
2023-11-30 CHUANGXI WI proposed to TB ISAC, see contribution ISC(23)000009r1
2023-11-14 MOURADAL WI proposed to TB ISAC, see contribution ISC(23)000009
 

ETSI Home Page Any comments or problems with this application? Please let us know...