2024-04-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/EE-02109' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  REN/EE-02109 EN 300 132-2   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2023-12-14) 2.7.2 Draft   View Standstill Information 2023-10-10
  Rapporteur Technical Officer Harmonised Standard
  Beniamino Gorini Laure Pourcin No
 
Title Environmental Engineering (EE); Power supply interface at the input of Information and Communication Technology (ICT) equipment; Part 2: -48 V Direct Current (DC)
Power supply interface at the input to ICT equipment (-48VDC) 
Scope and Field
of Application
To clarify the maximum current drain (clause 4.6) has to be performed up to -57 Vdc (instead of - 54 Vdc) and the inrush current test (clause 4.7.1) has to be performed at nominal, minimum and maximum voltages of the normal service voltage range 
Supporting
Organizations
Huawei Tech.(UK) Co.. Ltd, Nokia France, BT plc, Newen Srl 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTERFACE
POWER SUPPLY
  Better Living with ICT
     
Official Journal
     
Remarks
2023-12-14 gorinib Draft contributed - V 2.7.2 contributed for Discussion in EE2(23)000013 as Early draft
2023-12-14 GORINIB A new draft is uploaded - V 2.7.2 with status: Early draft
2023-10-12 Marcello Pagnozzi TB adoption of WI EE, see contribution EE(23)064027
2023-10-10 PAGNOZZI WI proposed to WG EE 02, see contribution EE(23)064027
2023-10-10 Marcello Pagnozzi WI accepted by WG EE 02, see contribution EE2(23)064011
2023-10-10 GORINIB WI proposed to WG EE 02, see contribution EE2(23)064011
 
Displaying Item 10 of 31...

ETSI Home Page Any comments or problems with this application? Please let us know...