2024-04-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'REN/EE-EEPS67' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  REN/EE-EEPS67 EN 301 575   EE EEPS
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Stable draft (2023-11-27) 1.2.3 Draft   View Standstill Information 2023-07-25
  Rapporteur Technical Officer Harmonised Standard
  Emilio Posca Laure Pourcin No
 
Title Environmental Engineering (EE); Measurement method for energy consumption of Customer Premises Equipment (CPE)
 
Scope and Field
of Application
update the existing standard considering:
evolution of CPE, lates update of EU CoC for broadband.
also consideration on requirement's methodology from other organization will be considered.
Clarification on the state actually covered by the standard will be done 
Supporting
Organizations
TELECOM ITALIA S.p.A., CNIT, HUAWEI TECH. GmbH, Newen Srl 

 

Keywords Projects Clusters Frequencies Mandates Directives
  CPE
Energy Efficiency
Power Measurement
  Better Living with ICT
     
Official Journal
     
Remarks
2024-01-23 gemma Stable draft proposal in contribution EEPS(23)000062 was Noted by EE EEPS (see RC EEPS(23)DIS075)
2023-11-27 posca Draft contributed - V 1.2.3 contributed for Discussion in EEPS(23)000062 as Stable draft
2023-11-27 posca A new draft is uploaded - V 1.2.3 with status: Stable draft - with comment: New draft according to the comments received in EE_EEPS_63
2023-10-12 posca Draft contributed - V 1.2.2 contributed for Discussion in EEPS(23)064031r1 as Early draft
2023-10-11 posca Early draft proposal in contribution EEPS(23)064031 was Revised by EE EEPS
2023-10-11 posca Draft contributed - V 1.2.2 contributed for Discussion in EEPS(23)064031 as Early draft
2023-10-11 posca A new draft is uploaded - V 1.2.2 with status: Early draft
2023-10-06 posca Draft contributed - V 1.2.1 contributed for Discussion in EEPS(23)000054 as Early draft
2023-10-06 posca A new draft is uploaded - V 1.2.1 with status: Early draft
2023-10-06 posca A new draft is uploaded - V 0.0.2 with status: Early draft
2023-10-06 posca A new draft is uploaded - V 0.0.1 with status: Early draft
2023-09-15 Paolo Gemma TB adoption of WI EE, see contribution EE(23)000013r1 in RC EE(23)DEC168
2023-08-31 GEMMA WI proposed to WG EE EEPS, see contribution EE(23)000013r1
2023-08-31 GEMMA WI proposed to WG EE EEPS, see contribution EE(23)000013
2023-08-31 Paolo Gemma WI accepted by WG EE EEPS, see contribution EEPS(23)000022 in RC EEPS(23)DEC073
2023-07-25 GEMMA WI proposed to WG EE EEPS, see contribution EEPS(23)000022
 

Specific aspects
  Environmental aspects
Displaying Item 8 of 31...

ETSI Home Page Any comments or problems with this application? Please let us know...