2026-06-13 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/ENI-0019v411_ENI_Models' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  RGS/ENI-0019v411_ENI_Models GS ENI 019   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Waiting - see "Remarks" (2026-04-16) 4.0.12 Draft   View Standstill Information 2023-06-19
  Rapporteur Technical Officer Harmonised Standard
  John Strassner Christine Mera No
 
Title Experiential Networked Intelligence (ENI); Representing, Inferring, and Proving Knowledge in ENI Models
 
Scope and Field
of Application
The present document continues to specify the development of the ENI information model. The present document will define data model requirements, as well as defining required and recommended practices for deriving data models from an information model. This will be illustrated by providing at least two different examples of how to derive technology-specific data models from the ENI information model. Finally, it will define ontology requirements, and explain how ontologies can be incorporated to augment, enhance, and specify meaning and different relationships between modelled entities. This latter is critical to provide semantic reasoning. The present document is specific to and enhances the current ENI System Architecture.
In Release 4 the present document will specify additions to the ENI Extended Core and Policy Models. It will also describe recommended approaches for using models to define APIs to complement the information present in GS ENI 005. 
Supporting
Organizations
Futurewei Inc Telefonica, Huawei UK, China Telecommunications  

 

Keywords Projects Clusters Frequencies Mandates Directives
  data models
INFORMATION MODEL
ontology
semantic reasoning
  Networks
     
Official Journal
     
Remarks
2026-03-03 mera TB approval proposal in contribution ENI(26)000_012 was Accepted by ENI (see RC ENI(26)DEC105)
2026-01-28 forbesray Draft contributed - V 4.0.12 contributed for Decision in ENI(26)000_012 as Final draft for approval
2026-01-28   A new draft is uploaded - V 4.0.12 with status: Final draft for approval - with comment: Discussed in ENI Call_322
2025-11-10   Status updated - V 4.0.11 with status: Stable draft
2025-11-10 forbesray Draft contributed - V 4.0.11 contributed for Information in ENI(25)036_017 as Early draft
2025-11-10   A new draft is uploaded - V 4.0.11 with status: Early draft - with comment: Pre-clean up
2025-10-29   Status updated - V 4.0.10 with status: Stable draft
2025-09-22 forbesray Draft contributed - V 4.0.10 contributed for Information in ENI(25)000_226 as Early draft
2025-09-22   A new draft is uploaded - V 4.0.10 with status: Early draft - with comment: at ENI_35
2025-05-18 forbesray Draft contributed - V 4.0.9 contributed for Information in ENI(25)034_010 as Early draft
2025-05-18   A new draft is uploaded - V 4.0.9 with status: Early draft - with comment: in call_208bis
2025-03-06 forbesra Draft contributed - V 4.0.8 contributed for Information in ENI(25)000_041 as Early draft
2025-03-06 forbesra A new draft is uploaded - V 4.0.8 with status: Early draft - with comment: in ENI_33
2025-02-04 forbesra Draft contributed - V 4.0.7 contributed for Information in ENI(25)033_009 as Early draft
2025-02-04 forbesra A new draft is uploaded - V 4.0.7 with status: Early draft - with comment: At Call_295
2024-09-16 forbesra Draft contributed - V 4.0.6 contributed for Information in ENI(24)000_172 as Early draft
2024-09-16 forbesra A new draft is uploaded - V 4.0.6 with status: Early draft - with comment: at ENI31
2024-09-16 forbesra A new draft is uploaded - V 4.0.5 with status: Early draft - with comment: at ENI_31
2024-09-16 forbesra Draft contributed - V 4.0.4 contributed for Information in ENI(24)000_169 as Early draft
2024-09-16 forbesra A new draft is uploaded - V 4.0.4 with status: Early draft - with comment: at ENI_31
2024-06-06 forbesra Draft contributed - V 4.0.3 contributed for Information in ENI(24)000_110 as Early draft
2024-06-06 forbesra A new draft is uploaded - V 4.0.3 with status: Early draft - with comment: At ENI_30
2024-05-10 forbesra Draft contributed - V 4.0.2 contributed for Information in ENI(24)030_014 as Early draft
2024-05-10 forbesra A new draft is uploaded - V 4.0.2 with status: Early draft - with comment: at call_274Bis
2023-12-15 forbesra Draft contributed - V 4.0.1 contributed for Information in ENI(24)000_003 as Early draft
2023-10-27 forbesra Draft contributed - V 4.0.1 contributed for Information in ENI(23)000_173 as Early draft
2023-10-27 forbesra A new draft is uploaded - V 4.0.1 with status: Early draft - with comment: from call_258
 

ETSI Home Page Any comments or problems with this application? Please let us know...