2026-06-13 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/ENI-002v411_Requirements' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  RGS/ENI-002v411_Requirements GS ENI 002   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Final draft for approval (2026-03-11) 4.0.6 Draft   View Standstill Information 2023-06-09
  Rapporteur Technical Officer Harmonised Standard
  Yu Zeng Christine Mera No
 
Title Experiential Networked Intelligence (ENI); ENI Requirements
 
Scope and Field
of Application
The purpose of the present document is to specify the requirements of how intelligence is applied to the network and applications in different scenarios to improve experience of service provision and network operation. Also, how intelligence enables dynamic autonomous behaviour and adaptive policy driven operation in a changing context. The ENI requirements are based on the ENI use case document and identified requirements from other SDOs. These requirements will form the base for the architecture design work.
In release 4, this document will add the requirements abstracted from new use cases and PoCs, as well as from the deliverables of other release 4 ENI work. 
Supporting
Organizations
Huawei UK; Intel Corporation (UK) Ltd; AsiaInfo Technology Inc; China Telecommunications; NTT Corporations.  

 

Keywords Projects Clusters Frequencies Mandates Directives
  artificial intelligence
MANAGEMENT
NETWORK
Requirements
  Networks
     
Official Journal
     
Remarks
2026-05-21 forbesray Draft contributed - V 4.0.6 contributed for Decision in ENI(26)38_011 as Final draft for approval
2026-03-11 zeng1 A new draft is uploaded - V 4.0.6 with status: Final draft for approval - with comment: Final Draft for Approval, updated during ENI_37, updated date 11-03-2026
2026-02-23 forbesray Draft contributed - V 4.0.5 contributed for Information in ENI(26)37_013 as Stable draft
2025-11-13   Status updated - V 4.0.5 with status: Stable draft
2025-11-12 forbesray Draft contributed - V 4.0.5 contributed for Decision in ENI(25)036_018 as Early draft
2025-11-12   A new draft is uploaded - V 4.0.5 with status: Early draft - with comment: After call 317
2025-10-08   Status updated - V 4.0.4 with status: Stable draft
2025-06-13 forbesray Draft contributed - V 4.0.4 contributed for Information in ENI(25)000_139 as Early draft
2025-06-13   A new draft is uploaded - V 4.0.4 with status: Early draft - with comment: at ENI_34
2024-11-26 wanghhain Draft contributed - V 4.0.3 contributed for Information in ENI(24)032_015 as Early draft
2024-11-26 wanghhain A new draft is uploaded - V 4.0.3 with status: Early draft
2024-06-06 forbesra Draft contributed - V 4.0.2 contributed for Information in ENI(24)000_111 as Early draft
2024-06-06 forbesra A new draft is uploaded - V 4.0.2 with status: Early draft - with comment: at ENI_30
2023-12-15 forbesra Draft contributed - V 4.0.1 contributed for Information in ENI(24)000_006 as Early draft
2023-09-05 forbesra Draft contributed - V 4.0.1 contributed for Information in ENI(23)000_137 as Early draft
2023-09-05 forbesra A new draft is uploaded - V 4.0.1 with status: Early draft - with comment: From ENI_27
 

ETSI Home Page Any comments or problems with this application? Please let us know...