2024-04-26 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/NFV-IFA031ed451' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/NFV-IFA031ed451 (PDF Format) Download standrd ref:
RGS/NFV-IFA031ed451 (Word Format)
  RGS/NFV-IFA031ed451 GS NFV-IFA 031   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-09-15) 4.5.1 2023-09-15 View Standstill Information 2023-03-21
  Rapporteur Technical Officer Harmonised Standard
  Joan Triay Nicolae Madalin Neag No
 
Title Network Functions Virtualisation (NFV) Release 4; Management and Orchestration; Requirements and interfaces specification for management of NFV-MANO
NFV-MANO mgmt spec 
Scope and Field
of Application
This revision of NFV-IFA 031 continues the development of the specification as part of the NFV Release 4. This edition will add requirements to support the Release 4 features. The scope of the former edition is summarized hereafter:

NFV-IFA 031 specifies the interface requirements, the interfaces and the necessary information elements enabling the fault, configuration and information, performance, state and log management of NFV-MANO functional entities. In addition, the document also describes the framework to support the management of NFV-MANO functional entities. The different aspects specified in NFV-IFA 031 have been analysed firstly in ETSI GR NFV-IFA 021. 
Supporting
Organizations
Docomo, Orange, PT Portugal, ZTE 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTERFACE
MANAGEMENT
MANO
NFV
Requirements
NFV_Release4
Networks
     
Official Journal
     
Remarks
2023-11-15 neagn WI Revision. 1 WI created with Ref: RGS/NFV-IFA031ed511. Comments copied = No, Schedule copied = Default
2023-09-11 neagn TB approval proposal in contribution NFV(23)000167 was Accepted by NFV (see RC NFV(23)DEC284)
2023-08-03 triay Draft contributed - V 4.4.4 contributed for Decision in NFV(23)000167 as Final draft for approval
2023-08-02 triay Status updated - V 4.4.4 with status: Final draft for approval
2023-07-25 triay A new draft is uploaded - V 4.4.4 with status: Stable draft
2023-06-20 triay A new draft is uploaded - V 4.4.3 with status: Early draft
2023-05-04 triay A new draft is uploaded - V 4.4.2 with status: Early draft - with comment: First version towards ed451. No modifications with respect to published version v4.4.1.
 
Displaying Item 26 of 60...

ETSI Home Page Any comments or problems with this application? Please let us know...