2024-04-26 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/NFV-IFA027ed511' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  RGS/NFV-IFA027ed511 GS NFV-IFA 027   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Final draft for approval (2024-04-16) 5.0.4 Draft 2023-03-17 View Standstill Information 2023-03-21
  Rapporteur Technical Officer Harmonised Standard
  Lijuan Chen Antoine Mouquet No
 
Title Network Functions Virtualisation (NFV) Release 5; Management and Orchestration; Performance Measurements Specification
Perf. Measurements Spec 
Scope and Field
of Application
This revision of NFV-IFA 027 continues the development of the specification as part of the NFV Release 5. This edition will add requirements to support the Release 4 and 5 features. The scope of the former edition is summarized hereafter:

NFV-IFA 027 specifies the performance measurements and use cases for descriptors and interfaces, including Or-Vnfm reference point, Ve-Vnfm reference point, Vi-Vnfm reference point, Or-Vi reference point, and Os-Ma-nfvo reference point, based on the performance metrics collected at NFVI. 
Supporting
Organizations
Docomo, Orange, PT Portugal, ZTE 

 

Keywords Projects Clusters Frequencies Mandates Directives
  MANAGEMENT
MANO
Measurement
NFV
PERFORMANCE
NFV_Release4
Networks
     
Official Journal
     
Remarks
2024-04-18 chenliju Draft contributed - V 5.0.4 contributed for Decision in NFV(24)000100 as Final draft for approval
2024-04-16 chenliju A new draft is uploaded - V 5.0.4 with status: Final draft for approval
2024-03-28 chenliju Status updated - V 5.0.3 with status: Stable draft
2024-03-22 chenliju A new draft is uploaded - V 5.0.3 with status: Early draft
2024-01-11 chenliju A new draft is uploaded - V 5.0.2 with status: Early draft
2023-11-28 chenliju A new draft is uploaded - V 5.0.1 with status: Early draft - with comment: Release 5 initial draft version. Unmodified with respect to version 4.4.4.
2023-09-25 chenliju A new draft is uploaded - V 4.4.4 with status: Early draft - with comment: Implemented the changes of the approved contribution during IFA_350-F2F meeting
2023-06-01 chenliju A new draft is uploaded - V 4.4.3 with status: Early draft
2023-04-10 chenliju A new draft is uploaded - V 4.4.2 with status: Early draft - with comment: Starting version for 1H2023 specification work. Unmodified with respect to published version v4.4.1.
 
Displaying Item 28 of 60...

ETSI Home Page Any comments or problems with this application? Please let us know...