2024-04-28 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/NFV-IFA053' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DGS/NFV-IFA053 GS NFV-IFA 053   NFV IFA
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2024-03-26) 0.8.0 Draft   View Standstill Information 2023-03-03
  Rapporteur Technical Officer Harmonised Standard
  Hammad Zafar Antoine Mouquet No
 
Title Network Functions Virtualisation (NFV) Release 5; Management and Orchestration; Requirements and interface specification for Physical Infrastructure Management
PIM 
Scope and Field
of Application
The work item analyzes architectural options for physical infrastructure management in an NFV environment. Starting from use cases from ETSI NFV documents (such as ETSI GS NFV-IFA 036, ETSI GR NFV-IFA 046 and DGR/NFV-EVE021) and inputs from Anuket RM and GSMA Operator Platform Group, it will evaluate existing solutions like IPMI, Ansible, DMTF Redfish, OpenStack Ironic, LFN ODIM and metal3 to prepare profiling of de-facto standards.
The work item defines requirements and builds up a common information model for describing the hardware attributes and status, and includes operations for managing infrastructure hardware with respect of life cycle and FCAPS of compute/storage/networking resources, including new types of resources like Smart-NICs.
The work item will consider the outcomes from the architectural analysis to determine the best specification approach of the interfaces and information modeling in relation to other ETSI NFV specifications.
The work item includes an informative study part as well as normative provisions. 
Supporting
Organizations
NEC Europe Ltd, TELEFONICA S.A., China Telecommunications, ZTE Corporation, DOCOMO Communications Lab., HUAWEI TECH. GmbH 

 

Keywords Projects Clusters Frequencies Mandates Directives
    NFV_Release5
       
Official Journal
     
Remarks
2024-03-26   A new draft is uploaded - V 0.8.0 with status: Early draft
2024-02-29   A new draft is uploaded - V 0.7.0 with status: Early draft
2024-01-03   A new draft is uploaded - V 0.6.0 with status: Early draft
2023-12-08   A new draft is uploaded - V 0.5.0 with status: Early draft
2023-11-08   A new draft is uploaded - V 0.4.0 with status: Early draft
2023-09-29   A new draft is uploaded - V 0.3.0 with status: Early draft
2023-09-13   A new draft is uploaded - V 0.2.0 with status: Early draft
2023-06-14   A new draft is uploaded - V 0.1.0 with status: Early draft
2023-05-26   A new draft is uploaded - V 0.0.2 with status: Early draft
2023-05-04   A new draft is uploaded - V 0.0.1 with status: Early draft
2023-04-06 Nicolae Madalin Neag TB adoption of WI NFV, see contribution NFV(23)000059r1 in RC NFV(23)DEC267
2023-03-24 KLEBERU WI proposed to WG NFV IFA, see contribution NFV(23)000059r1
2023-03-03 KLEBERU WI proposed to TB NFV, see contribution NFV(23)000059
 
Displaying Item 35 of 78...

ETSI Home Page Any comments or problems with this application? Please let us know...