2024-05-05 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTS/SmartM2M-103840' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTS/SmartM2M-103840 (PDF Format) Download standrd ref:
DTS/SmartM2M-103840 (Word Format)
  DTS/SmartM2M-103840 TS 103 840 T019 SmartM2M
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-08-10) 1.1.1 2023-08-10 View Standstill Information 2021-09-07
  Rapporteur Technical Officer Harmonised Standard
  Thierry Monteil Patrick Guillemin No
 
Title SmartM2M; Model for oneM2M Performance Evaluation
TTF D2 Model for oneM2M Performances Evaluation 
Scope and Field
of Application
Specification of procedures to assess the performance of oneM2M-based IoT platforms. This deliverable will include the identification and definition of a set/list of KPIs necessary to assess the deployment. The deliverable will include, for those KPIs, a formal description of the test campaign and the test results to be obtained. 
Supporting
Organizations
TELECOM ITALIA S.p.A., INRIA, Huawei Technologies Sweden AB, CNRS, FBConsulting S.A.R.L., SBS aisbl 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Application
Evaluation
IoT
Model
oneM2M
PERFORMANCE
  Connecting Things
     
Official Journal
     
Remarks
2023-05-31 guillemin Final draft for approval proposal in contribution SmartM2M(23)000018r1 was Accepted by SmartM2M
2023-05-24 guillemin Draft contributed - V 0.1.5 contributed for Decision in SmartM2M(23)000018r1 as Final draft for approval
2023-05-24 guillemin A new draft is uploaded - V 0.1.5 with status: Final draft for approval
2023-05-24 guillemin Stable draft proposal in contribution SmartM2M(23)000018 was Revised by SmartM2M
2023-05-09 monteilt A new draft is uploaded - V 0.1.4 with status: Final draft for approval
2023-04-28 monteilt A new draft is uploaded - V 0.1.3 with status: Stable draft
2023-04-25 monteilt A new draft is uploaded - V 0.1.2 with status: Early draft - with comment: meta model has been completed
2023-04-13 monteilt A new draft is uploaded - V 0.1.1 with status: Early draft - with comment: first sub-model has been completed
2023-03-30 guillemin Draft contributed - V 0.1.0 contributed for Discussion in SmartM2M(23)000018 as Stable draft
2023-03-30 guillemin A new draft is uploaded - V 0.1.0 with status: Stable draft
2021-09-07 MANGION TB adoption of WI SmartM2M, see contribution SmartM2M(21)000177
2021-09-07 GUILLEMI WI proposed to TB SmartM2M, see contribution SmartM2M(21)000177
 
Displaying Item 5 of 26...

ETSI Home Page Any comments or problems with this application? Please let us know...