2022-01-19 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/ENI-0029_ENI_Models' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DGS/ENI-0029_ENI_Models GS ENI 019   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2021-06-10) 0.0.3 Draft   View Standstill Information 2021-03-17
  Rapporteur Technical Officer Harmonised Standard
  John Strassner Christine Mera No
 
Title Experiential Networked Intelligence (ENI); Representing, Inferring, and Proving Knowledge in ENI
ENI Models 
Scope and Field
of Application
The purpose of the present document is to define the ENI information model. The present document will also provide at least two different examples of how to derive technology-specific data models from the ENI information model. Finally, it will explain how ontologies can be incorporated to augment, enhance, and specify meaning and different relationships between modelled entities. This latter is critical to provide semantic reasoning. The present document is specific to and enhances the current ENI System Architecture 
Supporting
Organizations
Futurewei, Portugal Telecom, China Telecom, Telefonica, InterDigital, Huawei UK 

 

Keywords Projects Clusters Frequencies Mandates Directives
  data models
design
INFORMATION MODEL
ontology
software
  Networks
     
Official Journal
     
Remarks
2021-10-25 forbesra Draft contributed - V 0.0.3 contributed for Information in ENI(21)000_219 as Early draft
2021-08-31 forbesra Draft contributed - V 0.0.3 contributed for Information in ENI(21)019_027 as Early draft
2021-06-22 forbesra Draft contributed - V 0.0.3 contributed for Information in ENI(21)000_144 as Early draft
2021-06-10 forbesra A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: baseline at ENI_18
2021-05-28 forbesra Draft contributed - V 0.0.2 contributed for Information in ENI(21)018_014 as Early draft
2021-05-12 forbesra Draft contributed - V 0.0.2 contributed for Information in ENI(21)000_108 as Early draft
2021-05-12 forbesra A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Approved by email after Call_178
2021-04-23 forbesra Draft contributed - V 0.0.1 contributed for Information in ENI(21)000_081 as Early draft
2021-04-23 forbesra A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: approved in Call_176 bis
 

ETSI Home Page Any comments or problems with this application? Please let us know...