2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/ENI-0023_Int_Policy_Model' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/ENI-0023_Int_Policy_Model (PDF Format) Download standrd ref:
DGR/ENI-0023_Int_Policy_Model (Word Format)
  DGR/ENI-0023_Int_Policy_Model GR ENI 013   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-01-17) 1.1.1 2023-01-17 View Standstill Information 2020-11-26
  Rapporteur Technical Officer Harmonised Standard
  Jiachen Zhang Christine Mera No
 
Title Experiential Networked Intelligence (ENI); Intent Policy Model Gap Analysis
Intent Policy Model Gap Analysis 
Scope and Field
of Application
The present document contains:
1) work on a gap analysis report on intent information model based on existing SDO work, including the policy management model as specified by ETSI ISG ENI in the system architecture deliverables, and,
2) the report also provides a list of recommendations on general guidelines addressing the high-level policy model of a number of each SDO’s intent policy model (i.e.: 3GPP SA5, NFV, TM Forum, IRTF, and ZSM), and how these guidelines compare with those stated in the ETSI ENI system architecture.

 
Supporting
Organizations
TELEFONICA S.A., NTT corporation, China Telecommunications, ZTE Corporation, InterDigital, Inc., AsiaInfo Technologies Inc 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INFORMATION MODEL
policies
policy management
  Networks
     
Official Journal
     
Remarks
2022-12-05 mera TB approval proposal in contribution ENI(22)000_229 was Accepted by ENI (see RC ENI(22)DEC078)
2022-10-31 forbesra Draft contributed - V 0.1.0 contributed for Decision in ENI(22)000_229 as Final draft for approval
2022-10-31 forbesra A new draft is uploaded - V 0.1.0 with status: Final draft for approval - with comment: ISG Approved
2022-10-21 forbesra Draft contributed - V 0.0.24 contributed for Information in ENI(22)000_220 as Final draft for approval
2022-10-21 forbesra A new draft is uploaded - V 0.0.24 with status: Final draft for approval - with comment: After Call_230
2022-09-23 forbesra Draft contributed - V 0.0.23 contributed for Information in ENI(22)000008 as Stable draft
2022-09-08 forbesra A new draft is uploaded - V 0.0.23 with status: Stable draft - with comment: Stable draft approved in ENI_23
2022-08-09 forbesra Draft contributed - V 0.0.22 contributed for Information in ENI(22)000_171 as Early draft
2022-08-09 forbesra A new draft is uploaded - V 0.0.22 with status: Early draft - with comment: Approved output of Call_222
2022-07-22 forbesra Draft contributed - V 0.0.21 contributed for Information in ENI(22)000_162 as Early draft
2022-07-22 zhangjiac A new draft is uploaded - V 0.0.21 with status: Early draft
2022-06-10 forbesra Draft contributed - V 0.0.20 contributed for Information in ENI(22)022_019 as Early draft
2022-06-10 forbesra A new draft is uploaded - V 0.0.20 with status: Early draft - with comment: Output draft approved on the ISG mailing list after call_217
2022-03-10 forbesra Draft contributed - V 0.0.19 contributed for Information in ENI(22)000_068 as Early draft
2022-03-10 forbesra A new draft is uploaded - V 0.0.19 with status: Early draft - with comment: Approved in ENI_21b day 4
2022-03-02 forbesra Draft contributed - V 0.0.18 contributed for Information in ENI(22)021_018 as Early draft
2022-02-28 forbesra Draft contributed - V 0.0.18 contributed for Information in ENI(22)000_065 as Early draft
2022-02-23 zhangjiac A new draft is uploaded - V 0.0.18 with status: Early draft
2022-02-15 strassnerj Early draft proposal in contribution ENI(22)000_056 was Revised by ENI
2022-02-08 forbesra Draft contributed - V 0.0.17 contributed for Information in ENI(22)000_056 as Early draft
2022-02-08 forbesra A new draft is uploaded - V 0.0.17 with status: Early draft - with comment: Approved in call_202bis will one objection, comments can still be made it is an interim draft
2022-01-21 zhangjiac A new draft is uploaded - V 0.0.16 with status: Early draft
2021-12-27 zhangjiac A new draft is uploaded - V 0.0.15 with status: Early draft
2021-10-25 forbesra Draft contributed - V 0.0.14 contributed for Information in ENI(21)000_217 as Early draft
2021-09-08 zhangjiac Draft contributed - V 0.0.14 contributed for Information in ENI(21)019_047 as Early draft
2021-09-08 zhangjiac A new draft is uploaded - V 0.0.14 with status: Early draft
2021-08-26 forbesra Draft contributed - V 0.0.13 contributed for Information in ENI(21)019_012 as Early draft
2021-08-26 forbesra A new draft is uploaded - V 0.0.13 with status: Early draft - with comment: baseline approved in call_191
2021-08-25 zhangjiac A new draft is uploaded - V 0.0.12 with status: Early draft
2021-08-13 zhangjiac Early draft proposal in contribution ENI(21)000030 was Withdrawn by ENI
2021-08-13 zhangjiac Draft contributed - V 0.0.11 contributed for Information in ENI(21)000030 as Early draft
2021-08-03 forbesra Draft contributed - V 0.0.11 contributed for Information in ENI(21)000_170 as Early draft
2021-08-03 forbesra A new draft is uploaded - V 0.0.11 with status: Early draft - with comment: Call_188
2021-08-03 mera TB approval proposal in contribution ENI(21)000_152 was Accepted by ENI (see RC ENI(21)DEC077)
2021-07-13 forbesra Draft contributed - V 0.0.10 contributed for Information in ENI(21)000_152 as Early draft
2021-07-01 forbesra A new draft is uploaded - V 0.0.10 with status: Early draft - with comment: baseline after Call_183
2021-06-10 forbesra Draft contributed - V 0.0.9 contributed for Information in ENI(21)018_036 as Early draft
2021-06-10 forbesra A new draft is uploaded - V 0.0.9 with status: Early draft - with comment: Baseline in ENI_18
2021-05-14 forbesra Draft contributed - V 0.0.8 contributed for Information in ENI(21)000_113 as Early draft
2021-05-14 forbesra A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: Applied TD 000_090 & TD 000_096
2021-05-10 forbesra Draft contributed - V 0.0.7 contributed for Information in ENI(21)000_104 as Early draft
2021-05-10 forbesra A new draft is uploaded - V 0.0.7 with status: Early draft - with comment: Call@176 with Annex as an Annex
2021-04-12 forbesra Draft contributed - V 0.0.6 contributed for Information in ENI(21)000_065 as Early draft
2021-04-02 forbesra Early draft proposal in contribution ENI(21)000_060r1 was Withdrawn by ENI
2021-04-02 forbesra Draft contributed - V 0.0.5 contributed for Information in ENI(21)000_060r1 as Early draft
2021-04-02 forbesra A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: Approved in Call_174 as communicated by the 1st VC
2021-04-02 wanghhain Early draft proposal in contribution ENI(21)000_060 was Revised by ENI
2021-03-31 forbesra Draft contributed - V 0.0.5 contributed for Information in ENI(21)000_060 as Early draft
2021-03-31 forbesra A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: v0.0.4 should be ENI(21)017_047r1
2021-03-31 forbesra Draft contributed - V 0.0.4 contributed for Information in ENI(21)000_058 as Early draft
2021-03-31 forbesra A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: Agreed in closing on ENI_17
2021-03-08 forbesra Draft contributed - V 0.0.3 contributed for Decision in ENI(21)017_039 as Early draft
2021-03-08 forbesra A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: discussed in ENI_17
2021-02-19 forbesra Early draft proposal in contribution ENI(21)017_006 was Withdrawn by ENI
2021-02-18 forbesra Draft contributed - V 0.0.2 contributed for Information in ENI(21)000_041 as Early draft
2021-02-18 forbesra A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Aligned Scope with ENI(21)000_005r2
2021-02-12 forbesra Draft contributed - V 0.0.1 contributed for Information in ENI(21)000001 as Early draft
2021-02-09 forbesra Draft contributed - V 0.0.1 contributed for Information in ENI(21)017_006 as Early draft
2021-02-09 forbesra A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: As agreed in call_170
2020-12-11 MERA TB adoption of WI ENI, see contribution ENI(20)016_013r4
2020-12-11 MERA WI proposed to TB ENI, see contribution ENI(20)016_013r4
2020-12-09 DENGLL WI proposed to TB ENI, see contribution ENI(20)016_013r3
2020-12-07 DENGLL WI proposed to TB ENI, see contribution ENI(20)016_013r2
2020-12-07 FORBESRA WI proposed to TB ENI, see contribution ENI(20)016_013r1
2020-11-26 DENGLL WI proposed to TB ENI, see contribution ENI(20)016_013
 

Specific aspects
  User/consumer aspects

ETSI Home Page Any comments or problems with this application? Please let us know...