2024-04-29 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/mWT-0028' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/mWT-0028 (PDF Format) Download standrd ref:
DGR/mWT-0028 (Word Format)
  DGR/mWT-0028 GR mWT 028   mWT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2023-04-05) 1.1.1 2023-04-05 View Standstill Information 2020-11-19
  Rapporteur Technical Officer Harmonised Standard
  Paolo Agabio Antoine Mouquet No
 
Title New KPI’s for planning microwave and millimeter wave backhaul network
Definition of new KPI’s for planning microwave and millimeter-wave backhaul network 
Scope and Field
of Application
Identify new KPI’s taking into account the evolution of wireless backhaul:
- more challenging requirements coming from 5G deployment
- new technologies aiming at more efficient interference mitigation and cancellation
- increase of use of spectrum in the millimetre-wave range, stand-alone and aggregated (BCA)
- different typology and mix of services transported
Analysis of applicability of the new KPI’s
Isolated links and Chains
Hubs
More general geographic areas (i.e. clusters of hubs)
Analysis of the impacts of the new KPI’s on:
Network planning
Equipment standards
Spectrum regulations and licensing
 
Supporting
Organizations
Ericsson LM, NEC Europe Ltd, VODAFONE Group Plc, Huawei Tech.(UK) Co., Ltd, Nokia France 

 

Keywords Projects Clusters Frequencies Mandates Directives
  backhaul
microwave
Millimetre wave
  Wireless Systems
     
Official Journal
     
Remarks
2023-02-28 mouqueta Final draft for approval proposal in contribution mWT(23)024023r1 was Accepted by mWT
2023-02-28 mouqueta Draft contributed - V 0.0.5 contributed for Decision in mWT(23)024023r1 as Final draft for approval
2023-02-28 mouqueta Final draft for approval proposal in contribution mWT(23)024023 was Revised by mWT
2023-02-28 mouqueta A new draft is uploaded - V 0.0.5 with status: Final draft for approval - with comment: Final draft after technical officer's review
2023-02-16 agabio Draft contributed - V 0.0.4 contributed for Decision in mWT(23)024023 as Final draft for approval
2023-02-16 agabio A new draft is uploaded - V 0.0.4 with status: Final draft for approval
2023-02-07 agabio Draft contributed - V 0.0.3 contributed for Discussion in mWT(23)024010 as Stable draft
2023-02-07 agabio A new draft is uploaded - V 0.0.3 with status: Stable draft
2022-11-28 agabio Draft contributed - V 0.0.2 contributed for Discussion in mWT(22)000017 as Early draft
2022-11-28 agabio A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: November 2022 update. For December 2022 GTM
2022-10-13 mouqueta A new draft is uploaded - V 0.0.1 with status: Early draft
2020-12-02 ZEIN TB adoption of WI mWT, see contribution mWT(20)017_019r1
2020-12-02 ZEIN WI proposed to TB mWT, see contribution mWT(20)017_019r1
2020-11-19 ZEIN WI proposed to TB mWT, see contribution mWT(20)017_019
 
  Displaying Item 1 of 15...

ETSI Home Page Any comments or problems with this application? Please let us know...