2024-05-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RTS/INT-00185' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RTS/INT-00185 (PDF Format) Download standrd ref:
RTS/INT-00185 (Word Format)
  RTS/INT-00185 TS 186 001-5   INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-04-12) 2.4.1 2022-04-12 View Standstill Information 2020-11-04
  Rapporteur Technical Officer Harmonised Standard
  Martin Brand Emmanuelle Chaulot-Talmon No
 
Title Core Network and Interoperability Testing (INT); Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 5: Test Suite Structure and Test Purposes (TSS&TP)
 
Scope and Field
of Application
Revision of ETSI TS 186 001-5  
Supporting
Organizations
TELECOM ITALIA S.p.A., Iskratel d.o.o. Ltd, Mesaqin.com s.r.o (Ltd.), Sintesio, Foundation 

 

Keywords Projects Clusters Frequencies Mandates Directives
  IMS
ISDN
NIT
SIP
  Interoperability
     
Official Journal
     
Remarks
2022-02-14 chaulottalmo TB approval proposal in contribution INT(21)050006r3 was Accepted by INT (see RC INT(21)DEC080)
2021-12-09 mouqueta Draft contributed - V 2.4.11 contributed for Decision in INT(21)050006r3 as Final draft for approval
2021-12-09 mouqueta Final draft for approval proposal in contribution INT(21)050006r2 was Revised by INT
2021-12-09 mouqueta A new draft is uploaded - V 2.4.11 with status: Final draft for approval
2021-12-01 brandm Draft contributed - V 2.4.10 contributed for Decision in INT(21)050010 as Final draft for approval
2021-12-01 brandm A new draft is uploaded - V 2.4.10 with status: Final draft for approval
2021-11-30 brandm Draft contributed - V 2.4.9 contributed for Decision in INT(21)050006r2 as Final draft for approval
2021-11-30 brandm Final draft for approval proposal in contribution INT(21)050006r1 was Revised by INT
2021-11-30 brandm A new draft is uploaded - V 2.4.9 with status: Final draft for approval
2021-11-29 brandm Draft contributed - V 2.4.8 contributed for Decision in INT(21)050006r1 as Final draft for approval
2021-11-29 brandm Final draft for approval proposal in contribution INT(21)050006 was Revised by INT
2021-11-29 brandm A new draft is uploaded - V 2.4.8 with status: Final draft for approval
2021-11-27 brandm Draft contributed - V 2.4.7 contributed for Decision in INT(21)050006 as Final draft for approval
2021-11-27 brandm A new draft is uploaded - V 2.4.7 with status: Final draft for approval
2021-06-11 chaulottalmo Final draft for approval proposal in contribution INT(21)048009 was Accepted by INT
2021-03-17 brandm Draft contributed - V 2.4.6 contributed for Decision in INT(21)048009 as Final draft for approval
2021-03-17 brandm A new draft is uploaded - V 2.4.6 with status: Final draft for approval
2020-12-01 CHAULOTT TB adoption of WI INT, see contribution INT(20)000025
2020-11-04 BRANDM WI proposed to TB INT, see contribution INT(20)000025
 

Specific aspects
  Environmental aspects
  User/consumer aspects
  Displaying Item 1 of 27...

ETSI Home Page Any comments or problems with this application? Please let us know...