2024-12-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/ENI-0016_Sys_Architecture' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/ENI-0016_Sys_Architecture (PDF Format) Download standrd ref:
RGS/ENI-0016_Sys_Architecture (Word Format)
  RGS/ENI-0016_Sys_Architecture GS ENI 005   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2021-12-09) 2.1.1 2021-12-09 View Standstill Information 2019-09-25
  Rapporteur Technical Officer Harmonised Standard
  John Strassner Christine Mera No
 
Title Experiential Networked Intelligence (ENI); System Architecture
Architecture 
Scope and Field
of Application
The purpose of this work item is to draft a GS to revise and enhance the specification of the software functional architecture of ENI. This work uses as its foundation the Functional Blocks and Reference Points defined in the first release of GS ENI 005.
This work item is organised around three efforts. The first is to further specify the functional blocks of the ENI System Architecture; the second is to define how model-driven principles are used to define key concepts used by ENI functional blocks; the third is to expand and detail interaction with other SDO Systems.
This work includes:
- specification of External Reference Points,
- specification of APIs for each External Reference Point,
- specification of Interfaces for each API,
- specification of formal semantics,
- specification of cognition processes,
- specification of how closed control loops are realised using functional blocks and appropriate AI mechanisms,
- specification of model-driven principles and procedures that show how the (single) information model is created and maintained,
- specification of model-driven principles and procedures that show how (multiple) data models are derived from the (single) information model,
- definition of how functional blocks are able to work collaboratively to implement desired functionality,
- definition of how context, situation-awareness, cognition, and policy are built using model-driven principles and procedures,
- definition of how knowledge is represented, managed, and processed,
- definition of more detailed interaction with various Assisted Systems in particular reference standard architectures as NFV MANO , MEF LSO, BBF CloudCO, ZSM,3GPP5G, etc.
Software architecture, in terms of functional blocks, and related interactions will be addressed to the extent needed for the implementation of the ENI functionalities.
Further enhancements that will be provided by Release 2 that may be found in §9 of GS ENI 005 v1.1.1.
 
Supporting
Organizations
PT PORTUGAL SGPS SA, TELECOM ITALIA S.p.A., Samsung R&D Institute UK, NTT corporation, Intel Corporation (UK) Ltd, China Telecommunications, Huawei Tech.(UK) Co.. Ltd, AsiaInfo Technologies Inc, Futurewei 

 

Keywords Projects Clusters Frequencies Mandates Directives
  API
ARCHITECTURE
artificial intelligence
closed control loop
Cognition
functional architecture
functional block
intent management
MANAGEMENT
model-driven engineering
NETWORK
policy management
  Networks
     
Official Journal
     
Remarks
2021-10-27 strassnerj Draft contributed - V 2.0.31 contributed for Decision in ENI(21)000_223 as Final draft for approval
2021-10-27 strassnerj A new draft is uploaded - V 2.0.31 with status: Final draft for approval
2021-08-27 forbesra Draft contributed - V 2.0.30 contributed for Information in ENI(21)019_015 as Final draft for approval
2021-07-04 forbesra A new draft is uploaded - V 2.0.30 with status: Final draft for approval - with comment: Approved in Call_183 with ENI(21)018_026r2
2021-05-21 forbesra A new draft is uploaded - V 2.0.29 with status: Early draft - with comment: for Stability review
2021-05-20 forbesra A new draft is uploaded - V 2.0.28 with status: Early draft - with comment: approved in Call_179
2021-05-07 forbesra Draft contributed - V 2.0.27 contributed for Information in ENI(21)000_101 as Early draft
2021-05-07 forbesra A new draft is uploaded - V 2.0.27 with status: Early draft - with comment: approved in Call_178
2021-04-29 forbesra Draft contributed - V 2.0.26 contributed for Information in ENI(21)000_089 as Early draft
2021-04-29 forbesra A new draft is uploaded - V 2.0.26 with status: Early draft - with comment: in Call176Ter
2021-04-23 forbesra Draft contributed - V 2.0.25 contributed for Information in ENI(21)000_080 as Early draft
2021-04-23 forbesra A new draft is uploaded - V 2.0.25 with status: Early draft - with comment: approved in Call 176 Bis
2021-04-15 forbesra A new draft is uploaded - V 2.0.24 with status: Early draft - with comment: approved in Call_176
2021-03-11 forbesra Draft contributed - V 2.0.23 contributed for Information in ENI(21)000_048 as Early draft
2021-03-11 forbesra A new draft is uploaded - V 2.0.23 with status: Early draft - with comment: in ENI_17
2021-02-23 forbesra Draft contributed - V 2.0.22 contributed for Information in ENI(21)017_017 as Early draft
2021-02-23 forbesra A new draft is uploaded - V 2.0.22 with status: Early draft - with comment: To be input to ENI_17
2020-12-10 forbesra A new draft is uploaded - V 2.0.21 with status: Early draft - with comment: at close of ENI_16
2020-12-08 forbesra Draft contributed - V 2.0.20 contributed for Information in ENI(20)016_066 as Early draft
2020-12-08 forbesra A new draft is uploaded - V 2.0.20 with status: Early draft - with comment: approved in ENI_16
2020-11-27 forbesra Draft contributed - V 2.0.19 contributed for Information in ENI(20)016_015 as Early draft
2020-11-27 forbesra A new draft is uploaded - V 2.0.19 with status: Early draft - with comment: Approved in call~153Bis
2020-11-05 forbesra A new draft is uploaded - V 2.0.18 with status: Early draft
2020-10-10 yuanxxu Early draft proposal in contribution ENI(20)000_142 was Withdrawn by ENI
2020-10-10 yuanxxu Draft contributed - V 2.0.13 contributed for Decision in ENI(20)000_142 as Early draft
2020-09-17 forbesra Draft contributed - V 2.0.17 contributed for Information in ENI(20)000_132 as Early draft
2020-09-17 forbesra A new draft is uploaded - V 2.0.17 with status: Early draft - with comment: approved ENI_15 baseline
2020-09-01 forbesra Draft contributed - V 2.0.16 contributed for Information in ENI(20)015_023 as Early draft
2020-09-01 forbesra A new draft is uploaded - V 2.0.16 with status: Early draft - with comment: baseline approved in Call157
2020-08-28 forbesra Draft contributed - V 2.0.15 contributed for Information in ENI(20)015_013 as Early draft
2020-08-28 forbesra A new draft is uploaded - V 2.0.15 with status: Early draft - with comment: approved in call_156
2020-07-16 forbesra A new draft is uploaded - V 2.0.14 with status: Early draft - with comment: agreed as baseline in call_154
2020-06-12 forbesra Draft contributed - V 2.0.13 contributed for Information in ENI(20)014_015 as Early draft
2020-06-12 forbesra A new draft is uploaded - V 2.0.13 with status: Early draft - with comment: Approved as baseline in Call_152
2020-06-04 forbesra A new draft is uploaded - V 2.0.12 with status: Early draft - with comment: as approved in call_150
2020-05-25 forbesra A new draft is uploaded - V 2.0.11 with status: Early draft - with comment: agreed in Call_148
2020-04-16 forbesra A new draft is uploaded - V 2.0.10 with status: Early draft - with comment: as output from call_142
2020-03-20 forbesra A new draft is uploaded - V 2.0.9 with status: Early draft - with comment: Approved at ENI_13
2020-03-17 forbesra A new draft is uploaded - V 2.0.8 with status: Early draft - with comment: Agreed in ENI_13
2020-03-09 forbesra Early draft proposal in contribution ENI(20)013_014 was Withdrawn by ENI
2020-03-06 forbesra Draft contributed - V 2.0.7 contributed for Decision in ENI(20)013_014 as Early draft
2020-02-28 forbesra A new draft is uploaded - V 2.0.7 with status: Early draft - with comment: after the call_138
2020-02-19 forbesra Draft contributed - V 2.0.6 contributed for Decision in ENI(20)000033 as Early draft
2020-02-19 forbesra A new draft is uploaded - V 2.0.6 with status: Early draft - with comment: Baseline from Call_136
2020-01-30 forbesra Draft contributed - V 2.0.5 contributed for Decision in ENI(20)000009 as Early draft
2020-01-30 forbesra A new draft is uploaded - V 2.0.5 with status: Early draft
2019-12-12 korycinska A new draft is uploaded - V 2.0.4 with status: Early draft - with comment: output draft from ENI_12 as in ENI(19)012_051
2019-12-02 strassner Draft contributed - V 2.0.3 contributed for Decision in ENI(19)012_017r1 as Early draft
2019-12-02 strassner Early draft proposal in contribution ENI(19)012_017 was Revised by ENI
2019-11-29 strassner Draft contributed - V 2.0.3 contributed for Decision in ENI(19)012_017 as Early draft
2019-11-29 strassner A new draft is uploaded - V 2.0.3 with status: Early draft
2019-11-29 strassner Early draft proposal in contribution ENI(19)012_012 was Revised by ENI
2019-11-26 forbesra Draft contributed - V 2.0.2 contributed for Decision in ENI(19)012_012 as Early draft
2019-11-26 forbesra A new draft is uploaded - V 2.0.2 with status: Early draft
2019-10-23 korycinska A new draft is uploaded - V 2.0.1 with status: Early draft - with comment: As per ENI(19)011_053r1 (output from ENI_11)
2019-09-26 KORYCINS TB adoption of WI ENI, see contribution ENI(19)011_049r1
2019-09-26 KORYCINS WI proposed to TB ENI, see contribution ENI(19)011_049r1
2019-09-25 KORYCINS WI proposed to TB ENI, see contribution ENI(19)011_049
 

Specific aspects
  Security/Privacy aspects

ETSI Home Page Any comments or problems with this application? Please let us know...