2024-05-05 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTR/RT-JTFIR-4' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTR/RT-JTFIR-4 (PDF Format) Download standrd ref:
DTR/RT-JTFIR-4 (Word Format)
  DTR/RT-JTFIR-4 TR 103 704 603 RT JTFIR
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-05-30) 1.1.1 2022-05-30 View Standstill Information 2019-09-16
  Rapporteur Technical Officer Harmonised Standard
  Etienne Fayt Andrea Lorelli No
 
Title Urban Rail ITS and Road ITS applications in the 5,9 GHz band; Measurement campaign to confirm simulation parameters to define Urban Rail ITS protected zones in 5 915 MHz to 5 925 MHz
 
Scope and Field
of Application
A measurement campaign is needed to validate TR 103 580 interference simulation results and to confirm simulation parameters which would be used to define the proper mitigation area to protect Urban Rail communications in 5915-5925 MHz. The following steps have to be achieved:
1. Identify relevant test cases
2. Identify relevant areas to conduct the measurements
3. Describe test procedures for each case
4. Conduct the measurement campaign
5. Conclude on the results 
Supporting
Organizations
Siemens AG, Volkswagen AG, Renault SAS, RATP, Alstom Transport SA 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ITS
Simulation
spectrum
  Transportation
Wireless Systems
     
Official Journal
     
Remarks
2022-03-24 sarfati TB approval proposal in contribution RT(22)085031 was Accepted by RT (see RC RT(22)DEC097)
2022-03-09 lorelli Draft contributed - V 0.0.5 contributed for Decision in RT(22)085031 as Working Draft
2022-03-09 paulet Final draft for approval proposal in contribution RTJTFIR(22)000010 was Accepted by RT JTFIR
2022-03-09 paulet Draft contributed - V 0.0.5 contributed for Decision in RTJTFIR(22)000010 as Final draft for approval
2022-03-09 paulet A new draft is uploaded - V 0.0.5 with status: Final draft for approval
2022-03-08 paulet Draft contributed - V 0.0.4 contributed for Decision in RTJTFIR(22)000009 as Final draft for approval
2022-03-08 paulet A new draft is uploaded - V 0.0.4 with status: Final draft for approval
2022-02-28 paulet A new draft is uploaded - V 0.0.3 with status: Final draft for approval - with comment: This is the final draft version considering all the changes agreed in the previous JTFIR meetings and as agreed during JTFIR_54bis
2021-12-07 etienne A new draft is uploaded - V 0.0.2 with status: Stable draft
2021-05-04 lorelli A new draft is uploaded - V 0.0.1 with status: Early draft
2019-10-07 LORELLI TB adoption of WI RT, see contribution RT(19)075016 in RC RT(19)DEC070
2019-09-16 LORELLI WI proposed to TB RT, see contribution RT(19)075016
 
Displaying Item 4 of 51...

ETSI Home Page Any comments or problems with this application? Please let us know...