2026-11-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DEN/ERM-TGUWB-594' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Standard Not
Ready For
Download
  DEN/ERM-TGUWB-594 EN 302 065-4-2   ERM WGUWB
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2026-02-24) 0.0.3 Draft 2025-08-20 View Standstill Information 2019-06-04
  Rapporteur Technical Officer Harmonised Standard
  Lüder Bosse Gabriele Perrone Yes
 
Title Short Range Devices (SRD) using Ultra Wide Band technology (UWB); Harmonised Standard for access to radio spectrum; Part 4: Material Sensing devices; Sub-part 2: UWB Material Sensing devices for fluid and gas analysis within 30 MHz to 10.6 GHz
UWB analysis of fluids and gas 
Scope and Field
of Application
This EN will cover non-contact and contact based UWB material determination devices for fluid and gas analysis applications. This includes a detailed description of the covered equipment categories, the related wanted performance requirement, RX-requirements and fixed limits for all requirements based on a clear test procedure. Equipment covered by the present document operates in accordance with EC DEC on UWB and ECC/DEC(07)01 for non-contact or contact based UWB material sensing devices and its amendments. 
Supporting
Organizations
BMWi, ROHDE & SCHWARZ, FBConsulting S.A.R.L., 2pi-Labs GmbH 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Harmonised standard
Measurement
UWB
  Better Living with ICT
Connecting Things
Home & Office
Wireless Systems
UWB (2,2 GHz to 8,5 GHz)
UWB (3,1 GHz to 10,6 GHz)
M/536
2014/53/EU
Official Journal
     
Remarks
2026-03-03 mahler Early draft proposal in contribution ERMTGUWB(26)76014 was Noted by ERM TGUWB
2026-02-24 mahler Draft contributed - V 0.0.3 contributed for Discussion in ERMTGUWB(26)76014 as Early draft
2026-02-24 mahler A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: updated draft for TGUWB_76
2026-02-11 mahler Early draft proposal in contribution ERMTGUWB(26)DD17005 was Noted by ERM TGUWB
2026-02-04 bosse Draft contributed - V 0.0.2 contributed for Discussion in ERMTGUWB(26)DD17005 as Early draft
2026-02-04   A new draft is uploaded - V 0.0.2 with status: Early draft
2025-12-03 mahler Early draft proposal in contribution ERMTGUWB(25)75023 was Noted by ERM TGUWB
2025-11-25 mahler Draft contributed - V 0.0.1 contributed for Discussion in ERMTGUWB(25)75023 as Early draft
2025-11-25 mahler A new draft is uploaded - V 0.0.1 with status: Early draft
2025-08-18 perroneg Change proposed at ERMTGUWB#73 and accepted at ERM#86
2019-06-27 BUTSCHEI TB adoption of WI ERM, see contribution ERM(19)068030
2019-06-06 MAHLER WI proposed to WG ERM TGUWB, see contribution ERM(19)068030
2019-06-06 MAHLER WI accepted by WG ERM TGUWB, see contribution ERMTGUWB(19)049b004
2019-06-04 MAHLER WI proposed to WG ERM TGUWB, see contribution ERMTGUWB(19)049b004
 

Specific aspects
  User/consumer aspects

ETSI Home Page Any comments or problems with this application? Please let us know...