2024-11-21 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/ENI-0012_PoC Framework' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/ENI-0012_PoC Framework (PDF Format) Download standrd ref:
RGS/ENI-0012_PoC Framework (Word Format)
  RGS/ENI-0012_PoC Framework GS ENI 006   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2020-05-18) 2.1.1 2020-05-18 View Standstill Information 2018-12-20
  Rapporteur Technical Officer Harmonised Standard
  Bill Wright Sylwia Korycinska-Bensaid No
 
Title Experiential Networked Intelligence (ENI); Proof of Concepts Framework
PoC Framework 
Scope and Field
of Application
This Work Item specifies a framework for use within ETSI ENI ISG to coordinate and promote public demonstrations of Proof of Concept (PoC) validating key technical components developed in ENI.

The objective for the PoCs is to build commercial awareness and confidence and encourage development of an open ecosystem by integrating components from different players.

This framework outlines:
•rationale for ENI ISG PoCs;
•ENI ISG PoC process;
•submission, format and criteria for ENI ISG PoC Proposals;
•review and acceptance criteria of PoC Proposals;
•ENI ISG PoC Report format and issues;
•ETSI support for PoC team.

The present publication is revised to include; e.g.:
•the ENI System Architecture,
•the ENI new issues and Use Cases,
•the ENI measurability criteria. 
Supporting
Organizations
PT PORTUGAL SGPS SA, TELECOM ITALIA S.p.A., Samsung R&D Institute UK, Intel Corporation (UK) Ltd, Huawei Tech.(UK) Co., Ltd, Red Hat Limited 

 

Keywords Projects Clusters Frequencies Mandates Directives
  INTEROPERABILITY
Proof of Concept
TESTING
  Networks
     
Official Journal
     
Remarks
2020-03-18 forbesra A new draft is uploaded - V 2.0.4 with status: Final draft for approval - with comment: Approved for Remote consensus on 31 days after ENI_13
2020-01-21 forbesra Draft contributed - V 2.0.3 contributed for Decision in ENI(20)013_006 as Final draft for approval
2020-01-21 forbesra A new draft is uploaded - V 2.0.3 with status: Final draft for approval - with comment: Prepare for final approval - aligned with the published ENI 001 v2.1.1 ENI 002 v2.1.1 & ENI 005 v1.1.1
2020-01-21 forbesra Status updated - V 2.0.2 with status: Stable draft
2020-01-17 forbesra Status updated - V 2.0.2 with status: Final draft for approval - with comment: No comments in the stability review period 12-12-2019 - 17-01-2020
2019-12-10 forbesra Status updated - V 2.0.2 with status: Stable draft - with comment: Declared stable at ENI_12
2019-11-26 forbesra Draft contributed - V 2.0.2 contributed for Decision in ENI(19)012_011 as Early draft
2019-09-09 forbesra Draft contributed - V 2.0.1 contributed for Decision in ENI(19)011_014r1 as Early draft
2019-09-09 forbesra A new draft is uploaded - V 2.0.2 with status: Early draft - with comment: Clean baseline
2019-09-09 forbesra Early draft proposal in contribution ENI(19)011_014 was Revised by ENI
2019-09-09 forbesra Draft contributed - V 2.0.1 contributed for Decision in ENI(19)011_014 as Early draft
2019-07-31 korycinska Draft contributed - V 2.0.1 contributed for Discussion in ENI(19)000199 as Early draft
2019-07-31 korycinska A new draft is uploaded - V 2.0.1 with status: Early draft
2019-03-19 forbesr Draft contributed - V 2.0.0 contributed for Decision in ENI(19)009_017 as Early draft
2019-03-18 forbesr Draft contributed - V 2.0.0 contributed for Decision in ENI(19)000066 as Early draft
2019-03-18 forbesr A new draft is uploaded - V 2.0.0 with status: Early draft - with comment: Release 2 Skeleton
2019-02-04 KORYCINS TB adoption of WI ENI, see contribution ENI(18)000228 in RC ENI(18)DEC039
2018-12-20 KORYCINS WI proposed to TB ENI, see contribution ENI(18)000228
 

ETSI Home Page Any comments or problems with this application? Please let us know...