2024-05-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RTS/ATTM-0251' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RTS/ATTM-0251 (PDF Format) Download standrd ref:
RTS/ATTM-0251 (Word Format)
  RTS/ATTM-0251 TS 105 174-8 571 ATTM AT2
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-12-23) 1.2.1 2019-12-23 View Standstill Information 2018-11-08
  Rapporteur Technical Officer Harmonised Standard
  Gilles Dretsch Marlène Forina No
 
Title Access, Terminals, Transmission and Multiplexing (ATTM); Broadband Deployment and Lifecycle Resource Management; Part 8: Implementation of WEEE practices for ICT equipment during maintenance and at end-of-life
Field recommendations to improve collection and treatment of WEEE for the ICT Sector 
Scope and Field
of Application
The present document supports the requirements of EN 305 174-8 providing a framework for, and detailing, the necessary implementation procedures.
The present document specifically extends the end-of-life aspects of ICT equipment to the treatment of components and sub-assemblies replaced during maintenance procedures. 
Supporting
Organizations
Orange, SBS aisbl, Airbus DS SLC, Association eG4U 

 

Keywords Projects Clusters Frequencies Mandates Directives
  BROADBAND
Energy Management
e-waste management
ICT
Waste management
  Better Living with ICT
Connecting Things
Content delivery
Home & Office
Interoperability
Networks
  M/462
 
Official Journal
     
Remarks
2019-11-25 forina WG approval proposal in contribution ATTM(19)000078 was Accepted by ATTM
2019-11-13 roched Draft contributed - V 0.0.4 contributed for Decision in ATTM(19)000078 as WG approval
2019-11-13 roched WG approval proposal in contribution ATTMAT2(19)000018 was Accepted by ATTM AT2 (see RC ATTMAT2(19)DEC038)
2019-11-03 roched Draft contributed - V 0.0.4 contributed for Decision in ATTMAT2(19)000018 as Final draft for approval
2019-11-03 roched A new draft is uploaded - V 0.0.4 with status: Final draft for approval
2019-10-23 forina A new draft is uploaded - V 0.0.3 with status: Stable draft
2019-10-11 forina TB approval proposal in contribution ATTM(19)000068 was Accepted by ATTM (see RC ATTM(19)DEC159)
2019-10-02 forina Draft contributed - V 0.0.2 contributed for Decision in ATTM(19)000068 as Stable draft
2019-10-02 forina A new draft is uploaded - V 0.0.2 with status: Stable draft
2019-10-02 roched WG approval proposal in contribution ATTMAT2(19)000013 was Accepted by ATTM AT2 (see RC ATTMAT2(19)DEC036)
2019-09-24 roched Draft contributed - V 0.0.1 contributed for Decision in ATTMAT2(19)000013 as Stable draft
2019-09-24 roched A new draft is uploaded - V 0.0.1 with status: Stable draft - with comment: Circulation for comments
2018-11-08 FORINA TB adoption of WI ATTM, see contribution ATTM(18)000082
2018-11-08 FORINA WI proposed to WG ATTM AT2, see contribution ATTM(18)000082
2018-11-08 ROCHED WI accepted by WG ATTM AT2, see contribution ATTMAT2(18)000020
2018-11-08 ROCHED WI proposed to WG ATTM AT2, see contribution ATTMAT2(18)000020
 

Specific aspects
  Environmental aspects

ETSI Home Page Any comments or problems with this application? Please let us know...