2024-11-06 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGR/ENI-0011_Def_Cat_AI_Ap_Net' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGR/ENI-0011_Def_Cat_AI_Ap_Net (PDF Format) Download standrd ref:
DGR/ENI-0011_Def_Cat_AI_Ap_Net (Word Format)
  DGR/ENI-0011_Def_Cat_AI_Ap_Net GR ENI 007   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-11-18) 1.1.1 2019-11-18 View Standstill Information 2018-09-18
  Rapporteur Technical Officer Harmonised Standard
  Luca Pesando Sylwia Korycinska-Bensaid No
 
Title Experiential Networked Intelligence (ENI); ENI Definition of Categories for AI Application to Networks
Categorization 
Scope and Field
of Application
This Work Item will address the aspects of gradual implementation of networked intelligence and specify a categorization framework for systems based on several different levels (e.g. 5, ranging from fully manual to fully autonomic systems as written in ENI whitepaper). This categorization framework will be based on the amount of network engineer intervention and attentiveness required and the expected interfaces with the assisted system. The details of each level will be defined according to scenarios supported and techniques needed. 
Supporting
Organizations
TELECOM ITALIA S.p.A., Samsung R&D Institute UK, Huawei Technologies Co. Ltd., China Telecommunications 

 

Keywords Projects Clusters Frequencies Mandates Directives
  artificial intelligence
categorization
category
NETWORK
  Networks
     
Official Journal
     
Remarks
2019-10-29 korycinska TB approval proposal in contribution ENI(19)011_055r1 was Accepted by ENI (see RC ENI(19)DEC049)
2019-09-26 pesando Draft contributed - V 0.1.3 contributed for Decision in ENI(19)011_055r1 as Final draft for approval
2019-09-26 pesando Final draft for approval proposal in contribution ENI(19)011_055 was Revised by ENI
2019-09-26 pesando A new draft is uploaded - V 0.1.3 with status: Final draft for approval
2019-09-26 pesando Draft contributed - V 0.1.2 contributed for Decision in ENI(19)011_055 as Final draft for approval
2019-09-26 pesando Status updated - V 0.1.2 with status: Final draft for approval
2019-09-26 pesando A new draft is uploaded - V 0.1.2 with status: Early draft
2019-09-25 pesando Draft contributed - V 0.1.1 contributed for Decision in ENI(19)011_052 as Stable draft
2019-09-25 pesando A new draft is uploaded - V 0.1.1 with status: Stable draft
2019-09-25 pesando Stable draft proposal in contribution ENI(19)011_051 was Withdrawn by ENI
2019-09-25 pesando Draft contributed - V 0.1.0 contributed for Decision in ENI(19)011_051 as Stable draft
2019-09-23 huangbin Draft contributed - V 0.1.0 contributed for Decision in ENI(19)011_023r1 as Stable draft
2019-09-23 huangbin Stable draft proposal in contribution ENI(19)011_023 was Revised by ENI
2019-09-16 huangbin Draft contributed - V 0.1.0 contributed for Decision in ENI(19)011_023 as Stable draft
2019-08-27 pesando Draft contributed - V 0.1.0 contributed for Decision in ENI(19)011_009 as Stable draft
2019-08-27 pesando A new draft is uploaded - V 0.1.0 with status: Stable draft
2019-08-21 pesando Draft contributed - V 0.0.16 contributed for Decision in ENI(19)000212 as Stable draft
2019-08-21 pesando A new draft is uploaded - V 0.0.16 with status: Stable draft
2019-08-07 pesando Draft contributed - V 0.0.15 contributed for Decision in ENI(19)000202 as Stable draft
2019-07-31 pesando A new draft is uploaded - V 0.0.15 with status: Stable draft
2019-07-31 liuwi Early draft proposal in contribution ENI(19)000200r1 was Withdrawn by ENI
2019-07-31 liuwi Draft contributed - V 0.0.13 contributed for Decision in ENI(19)000200r1 as Early draft
2019-07-31 liuwi Early draft proposal in contribution ENI(19)000200 was Revised by ENI
2019-07-31 liuwi Draft contributed - V 0.0.13 contributed for Decision in ENI(19)000200 as Early draft
2019-07-31 pesando Draft contributed - V 0.0.14 contributed for Decision in ENI(19)000197 as Early draft
2019-07-31 pesando A new draft is uploaded - V 0.0.14 with status: Early draft
2019-07-30 pesando A new draft is uploaded - V 0.0.13 with status: Early draft
2019-07-23 pesando Draft contributed - V 0.0.12 contributed for Decision in ENI(19)000187 as Early draft
2019-07-23 pesando A new draft is uploaded - V 0.0.12 with status: Early draft
2019-07-11 pesando Draft contributed - V 0.0.11 contributed for Decision in ENI(19)010_045 as Stable draft
2019-07-11 pesando A new draft is uploaded - V 0.0.11 with status: Stable draft
2019-06-18 forbesra Status updated - V 0.0.10 with status: Stable draft
2019-06-11 forbesra Draft contributed - V 0.0.10 contributed for Decision in ENI(19)010_010 as Early draft
2019-05-29 pesando Draft contributed - V 0.0.10 contributed for Decision in ENI(19)000130 as Early draft
2019-05-29 pesando A new draft is uploaded - V 0.0.10 with status: Early draft
2019-05-14 forbesra Draft contributed - V 0.0.9 contributed for Decision in ENI(19)000103 as Early draft
2019-05-13 pesando Early draft proposal in contribution ENI(19)000099 was Withdrawn by ENI
2019-05-13 pesando Draft contributed - V 0.0.9 contributed for Decision in ENI(19)000099 as Early draft
2019-05-13 pesando Early draft proposal in contribution ENI(19)000091 was Revised by ENI
2019-05-06 pesando Draft contributed - V 0.0.9 contributed for Decision in ENI(19)000091 as Early draft
2019-05-06 pesando A new draft is uploaded - V 0.0.9 with status: Early draft
2019-04-11 pesando Draft contributed - V 0.0.8 contributed for Decision in ENI(19)009_047 as Early draft
2019-04-11 pesando A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: as modified after the discussion at meeting ENI_9
2019-03-19 forbesr Draft contributed - V 0.0.7 contributed for Decision in ENI(19)009_018 as Early draft
2019-02-27 korycinska A new draft is uploaded - V 0.0.7 with status: Early draft
2019-02-27 korycinska Draft file Deleted - Version 0.0.7 in file ENI-0011v007.docx has been permanently deleted
2019-02-27 pesando A new draft is uploaded - V 0.0.7 with status: Early draft
2019-02-06 pesando Draft contributed - V 0.0.6 contributed for Decision in ENI(19)000030 as Early draft
2019-02-06 pesando A new draft is uploaded - V 0.0.6 with status: Early draft
2018-12-21 forbesr Draft contributed - V 0.0.5 contributed for Decision in ENI(19)000002 as Early draft
2018-12-20 korycinska A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Output draft from call_84-bis (merging of contributions from ENI_08)
2018-12-20 korycinska Draft file Deleted - Version 0.0.5 in file ENI-0011v005.docx has been permanently deleted
2018-12-06 korycinska A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Output draft from ENI_08 as per contribution ENI(18)008_010r3
2018-11-26 korycinska A new draft is uploaded - V 0.0.4 with status: Early draft
2018-11-26 korycinska Draft file Deleted - Version 0.0.4 in file ENI-0011v004.docx has been permanently deleted
2018-11-23 korycinska A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: v0.0.4 corresponds to contribution ENI(18)000224 (revised v0.0.3 of the draft)
2018-11-22 pesando Early draft proposal in contribution ENI(18)000223r1 was Withdrawn by ENI
2018-11-22 pesando Draft contributed - V 0.0.3 contributed for Decision in ENI(18)000223r1 as Early draft
2018-11-22 pesando Early draft proposal in contribution ENI(18)000223 was Revised by ENI
2018-11-21 pesando Draft contributed - V 0.0.3 contributed for Decision in ENI(18)000223 as Early draft
2018-11-21 pesando A new draft is uploaded - V 0.0.3 with status: Early draft
2018-11-06 pesando Draft contributed - V 0.0.2 contributed for Decision in ENI(18)000213 as Early draft
2018-11-06 pesando A new draft is uploaded - V 0.0.2 with status: Early draft
2018-11-05 pesando Draft contributed - V 0.0.1 contributed for Decision in ENI(18)000210 as Early draft
2018-10-24 pesando Early draft proposal in contribution ENI(18)000174r3 was Withdrawn by ENI
2018-10-24 pesando Draft contributed - V 0.0.1 contributed for Decision in ENI(18)000174r3 as Early draft
2018-10-24 pesando Early draft proposal in contribution ENI(18)000174r2 was Revised by ENI
2018-10-17 pesando Draft contributed - V 0.0.1 contributed for Decision in ENI(18)000174r2 as Early draft
2018-10-17 pesando Early draft proposal in contribution ENI(18)000174r1 was Revised by ENI
2018-10-08 pesando Draft contributed - V 0.0.1 contributed for Decision in ENI(18)000174r1 as Early draft
2018-10-08 pesando Early draft proposal in contribution ENI(18)000174 was Revised by ENI
2018-10-05 korycinska Draft contributed - V 0.0.1 contributed for Decision in ENI(18)000174 as Early draft
2018-10-05 korycinska A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: Input draft for a call_77
2018-09-19 KORYCINS TB adoption of WI ENI, see contribution ENI(18)007_030r1
2018-09-19 KORYCINS WI proposed to TB ENI, see contribution ENI(18)007_030r1
2018-09-18 KORYCINS WI proposed to TB ENI, see contribution ENI(18)007_030
 

ETSI Home Page Any comments or problems with this application? Please let us know...