2024-12-04 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/NFV-SOL009ed331' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGS/NFV-SOL009ed331 (PDF Format) Download standrd ref:
DGS/NFV-SOL009ed331 (Word Format)
  DGS/NFV-SOL009ed331 GS NFV-SOL 009   NFV SOL
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-10-29) 3.3.1 2019-10-29 View Standstill Information 2018-09-10
  Rapporteur Technical Officer Harmonised Standard
  Joan Triay Laurent Vreck No
 
Title Network Functions Virtualisation (NFV) Release 3; Protocols and Data Models: RESTful protocols specification for the management of NFV-MANO
MANO mgmt stage 3 
Scope and Field
of Application
The work item will specify a set of RESTful protocols and data models fulfilling the requirements specified in ETSI GS NFV-IFA 031 for the interfaces that enable the management of NFV-MANO functional entities.
The resulting deliverable will contain normative provisions. 
Supporting
Organizations
Orange, PT PORTUGAL SGPS SA, NEC Europe Ltd, ZTE Corporation, DOCOMO Communications Lab., Verizon UK Ltd, Huawei Tech.(UK) Co., Ltd, Nokia Germany 

 

Keywords Projects Clusters Frequencies Mandates Directives
  API
MANAGEMENT
MANO
NFV
STAGE 3
NFV_Release3
Networks
     
Official Journal
     
Remarks
2020-05-14 vreck WI Revision. 1 WI created with Ref: DGS/NFV-SOL009ed341. Comments copied = No, Schedule copied = Default
2019-10-07 vreck Final draft for approval proposal in contribution NFV(19)000214 was Accepted by NFV
2019-08-23 triay Draft contributed - V 0.8.0 contributed for Decision in NFV(19)000214 as Final draft for approval
2019-08-22 chatras Status updated - V 0.8.0 with status: Final draft for approval
2019-08-13 triay A new draft is uploaded - V 0.8.0 with status: Final draft for approval - with comment: Version after the final review of the stable draft.
2019-06-24 triay A new draft is uploaded - V 0.7.0 with status: Stable draft - with comment: Implementation of contributions approved at SOL_102. Declaration of stable draft.
2019-06-03 triay A new draft is uploaded - V 0.6.0 with status: Early draft - with comment: Version with approvals from SOL_101.
2019-04-15 triay A new draft is uploaded - V 0.5.0 with status: Early draft - with comment: Implementation of contributions approved at SOL_93-EA, SOL_94-EA and SOL_95.
2019-02-28 triay A new draft is uploaded - V 0.4.0 with status: Early draft - with comment: Version after SOL_92.
2019-01-17 triay A new draft is uploaded - V 0.3.0 with status: Early draft - with comment: New version with approvals from SOL_85-EA, SOL_86-EA, and SOL_87 .
2018-12-14 triay A new draft is uploaded - V 0.2.0 with status: Early draft - with comment: New version after SOL_84 and SOL_85-F2F.
2018-11-22 triay A new draft is uploaded - V 0.1.0 with status: Early draft - with comment: Implementation of contributions approved at SOL_83 and post EA.
2018-10-04 triay A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: First draft version of the GS with skeleton and scope.
2018-09-24 TRIAY TB adoption of WI NFV, see contribution NFV(18)000227r1
2018-09-20 TRIAY WI proposed to WG NFV SOL, see contribution NFV(18)000227r1
2018-09-10 TRIAY WI proposed to TB NFV, see contribution NFV(18)000227
 

ETSI Home Page Any comments or problems with this application? Please let us know...