Details of 'RGS/ENI-007_Requirements' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/ENI-007_Requirements (PDF Format) Download standrd ref:
RGS/ENI-007_Requirements (Word Format)
  RGS/ENI-007_Requirements GS ENI 002   ENI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-09-06) 2.1.1 2019-09-06 View Standstill Information 2018-04-20
  Rapporteur Technical Officer Harmonised Standard
  Haining Wang Sylwia Korycinska-Bensaid No
 
Title Experiential Networked Intelligence (ENI); ENI requirements
Requirements 
Scope and Field
of Application
This document specifies the requirements related to ENI. This includes the common requirements for both fixed and mobile, fixed specific requirements and mobile specific requirements. The ENI requirements are based on the ENI use case document and identified requirements from other SDOs. These requirements will form the base for the architecture design work.

This revision will update the existing requirements where needed and add new functional and non-functional, security and architectural requirements. 
Supporting
Organizations
Samsung R&D Institute UK, China Telecommunications, Verizon UK Ltd, Huawei Tech.(UK) Co., Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  artificial intelligence
MANAGEMENT
NETWORK
Requirements
  Networks
     
Official Journal
     
Remarks
2019-08-21 korycinska TB approval proposal in contribution ENI(19)010_007r3 was Accepted by ENI (see RC ENI(19)DEC044)
2019-07-11 korycinska Draft contributed - V 2.0.6 contributed for Decision in ENI(19)010_007r3 as Final draft for approval
2019-07-11 korycinska Final draft for approval proposal in contribution ENI(19)010_007r2 was Revised by ENI
2019-07-11 korycinska Status updated - V 2.0.6 with status: Final draft for approval - with comment: Change of status agreed at ENI_10
2019-07-10 korycinska Draft contributed - V 2.0.6 contributed for Decision in ENI(19)010_007r2 as Stable draft
2019-07-10 korycinska Stable draft proposal in contribution ENI(19)010_007r1 was Revised by ENI
2019-07-10 korycinska Status updated - V 2.0.6 with status: Stable draft - with comment: Correcting mistake of the draft status
2019-07-09 korycinska Draft contributed - V 2.0.6 contributed for Decision in ENI(19)010_007r1 as Early draft
2019-07-09 korycinska Stable draft proposal in contribution ENI(19)010_007 was Revised by ENI
2019-07-09 korycinska A new draft is uploaded - V 2.0.6 with status: Early draft
2019-05-31 forbesra Draft contributed - V 2.0.5 contributed for Decision in ENI(19)010_007 as Stable draft
2019-05-31 forbesra A new draft is uploaded - V 2.0.5 with status: Stable draft - with comment: Stable after Call_105 on review until coB 17.00 ETSI time 28 June 2019
2019-04-26 korycinska Schedule updated at ENI#09
2019-03-19 forbesr Draft contributed - V 2.0.4 contributed for Decision in ENI(19)009_020 as Early draft
2019-03-19 forbesr Early draft proposal in contribution ENI(19)009_015 was Revised by ENI
2019-03-19 forbesr A new draft is uploaded - V 2.0.4 with status: Early draft - with comment: after call 94
2019-03-19 forbesr Draft contributed - V 2.0.3 contributed for Decision in ENI(19)009_015 as Early draft
2019-02-11 forbesr A new draft is uploaded - V 2.0.3 with status: Early draft - with comment: V2.0.3 output after call_89
2018-11-20 forbesr Draft contributed - V 2.0.2 contributed for Decision in ENI(18)008_007 as Early draft
2018-11-06 forbesr Draft contributed - V 2.0.2 contributed for Discussion in ENI(18)000212 as Early draft
2018-11-06 forbesr A new draft is uploaded - V 2.0.2 with status: Early draft - with comment: v2.0.2
2018-09-04 forbesr Draft contributed - V 2.0.1 contributed for Information in ENI(18)007_013 as Early draft
2018-07-10 korycinska A new draft is uploaded - V 2.0.1 with status: Early draft - with comment: Output draft from ENI_06 (agreed at call_66 as ENI(18)000141)
2018-06-11 forbesr Draft contributed - V 2.0.0 contributed for Information in ENI(18)006_007 as Early draft
2018-06-08 forbesr A new draft is uploaded - V 2.0.0 with status: Early draft - with comment: For contribution toward
2018-05-14 KORYCINS TB adoption of WI ENI, see contribution ENI(18)000089 in RC ENI(18)DEC031
2018-04-20 KORYCINS WI proposed to TB ENI, see contribution ENI(18)000089
 

Specific aspects
  User/consumer aspects