2024-05-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DES/EE-0269' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DES/EE-0269 (PDF Format) Download standrd ref:
DES/EE-0269 (Word Format)
  DES/EE-0269 ES 203 700   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2021-02-15) 1.1.1 2021-02-15 View Standstill Information 2017-05-31
  Rapporteur Technical Officer Harmonised Standard
  Paolo Gemma Marcello Pagnozzi No
 
Title Environmental Engineering (EE); Sustainable power feeding solutions for 5G network
5Gpowering (TA-ITU:L.1210) 
Scope and Field
of Application
This standard will define power feeding solutions for 5G equipment and network, and their environmental impact. It will include requirements of different solutions and equipment on power feeding structures, components, backup solutions, environmental condition. Safety and EMC requirements will refer to relevant standards.
The future development of 5G networks justify this standard. It is plausible that a new scenario in which the density of radio cells will increase considerably, thereby creating the need to define new solutions for powering being environmentally friendly, sustainable, smart and with remote management that can include energy saving coordinated at network level.
The - 48 Vdc, up to 400 Vdc solutions defined in ETSI EN 300 132-2, ITU-T L.1200 will be considered as the standards in force for power facilities. Solution based on
remote powering will refer to ETSI EN 302 099. 
Supporting
Organizations
ORANGE, Ericsson AB, HUAWEI TECH. GmbH, Eltek 

 

Keywords Projects Clusters Frequencies Mandates Directives
  5G
CABLE
Energy Efficiency
HYBRID
POWER
REMOTE
Sustainability
  Better Living with ICT
     
Official Journal
     
Remarks
2019-11-07 pagnozzi WG approval proposal in contribution EE(19)056034 was Accepted by EE
2019-11-07 gemma Draft contributed - V 0.0.5 contributed for Decision in EE(19)056034 as WG approval
2019-11-06 pagnozzi Final draft for approval proposal in contribution EE2(19)056007 was Accepted by EE 02
2019-11-06 gemma Draft contributed - V 0.0.5 contributed for Decision in EE2(19)056007 as Final draft for approval
2019-11-06 gemma A new draft is uploaded - V 0.0.5 with status: Final draft for approval
2019-11-06 gemma Final draft for approval proposal in contribution EE2(19)000008 was Noted by EE 02 (see RC EE2(19)DEC032)
2019-10-02 gemma Draft contributed - V 0.0.4 contributed for Decision in EE2(19)000008 as Final draft for approval
2019-10-02 gemma A new draft is uploaded - V 0.0.4 with status: Final draft for approval - with comment: result of joint meeting
2019-06-04 gemma Draft contributed - V 0.0.3 contributed for Discussion in EE2(19)000004 as Stable draft
2019-06-04 gemma A new draft is uploaded - V 0.0.3 with status: Stable draft
2018-03-27 marquet A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: result of ITU-T Q6 drafting rapporteur meeting
2018-02-10 marquet Draft contributed - V 0.0.1 contributed for Discussion in EE(18)000005 as Early draft
2018-02-10 marquet A new draft is uploaded - V 0.0.1 with status: Early draft - with comment: early draft proposed at 16th January joint e-meeting with ITU-T SG5 Q6
2017-07-15 MARQUET TB adoption of WI EE, see contribution EE(17)051033 in RC EE(17)DEC100
2017-06-01 MARQUET WI Proposal withdrawn EE, see contribution EE(17)051040
2017-05-31 MARQUET WI proposed to WG EE 02, see contribution EE(17)051040
2017-05-31 MARQUET WI proposed to WG EE 02, see contribution EE(17)051033
2017-05-31 MARQUET WI accepted by WG EE 02, see contribution EE2(17)000007
2017-05-31 MARQUET WI proposed to WG EE 02, see contribution EE2(17)000007
 

Specific aspects
  Environmental aspects

ETSI Home Page Any comments or problems with this application? Please let us know...