2024-11-06 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTS/INT-00138-2' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTS/INT-00138-2 (PDF Format) Download standrd ref:
DTS/INT-00138-2 (Word Format)
  DTS/INT-00138-2 TS 103 571-2 544 INT
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2019-04-15) 1.1.1 2019-04-15 View Standstill Information 2017-01-05
  Rapporteur Technical Officer Harmonised Standard
  Peter Schmitting Helene Schmidt No
 
Title Core Network and Interoperability Testing (INT); Diameter Conformance testing for Sh/Dh interfaces; (3GPP™ Release 13); Part 2: Test Suite Structure (TSS) and Test Purposes (TP)
(TSS) and Test Purposes (TP) - Diameter Conformance Testing for the Sh/Dh interfaces 
Scope and Field
of Application
Given that there are already test specifications related to the Diameter protocol profile for the Rf and the Ro reference points under validation, it seems reasonable to extend the INT set of test specifications to also cover Diameter on the Sh and Dh reference points as similar procedures are covered on those interfaces. This would complete the set of test specification for the technical area of IMS subscriber authentication and authorization.

Following the methodologies developed and used by ETSI this means productions of a multi-part document covering the both the static conformance review (PICS proforma) and the dynamic conformance review (Test Purposes, Abstract Test Suite). The result would be a complete set of Diameter test suites for internal and external Diameter message exchanges.

ETSI members of the above mentioned trials have expressed their interest in test specifications related to the Diameter protocol profile for the Sh and Dh reference point as defined in ETSI TS 129 328 and ETSI TS 129 329 and also declared their willingness to review the outputs of this STF and in a later stage in a potential follow-up project provide ETSI with the possibility to validate the outputs of this STF against their LTE components (i.e. HSS, AS, OSA OCS, SLF). See also list of supporting organisations.
 
Supporting
Organizations
TELECOM ITALIA S.p.A., Deutsche Telekom AG, Iskratel d.o.o. Ltd, Sintesio, Foundation 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Diameter
TSS&TP
3GPP-Release-13
Interoperability
     
Official Journal
     
Remarks
2018-12-06 schmidth Final draft for approval proposal in contribution INT(18)041013 was Accepted by INT
2018-11-13 schmitting Draft contributed - V 0.0.8 contributed for Decision in INT(18)041013 as Final draft for approval
2018-11-13 schmitting A new draft is uploaded - V 0.0.8 with status: Final draft for approval
2018-10-05 schmitting A new draft is uploaded - V 0.0.7 with status: Stable draft
2018-07-11 schmitting Draft contributed - V 0.0.5 contributed for Discussion in INT(18)040008r1 as Stable draft
2018-07-11 schmitting Stable draft proposal in contribution INT(18)040008 was Revised by INT
2018-07-11 schmitting A new draft is uploaded - V 0.0.5 with status: Stable draft
2018-07-05 schmitting Draft contributed - V 0.0.4 contributed for Discussion in INT(18)040008 as Stable draft
2018-07-05 schmitting A new draft is uploaded - V 0.0.4 with status: Stable draft
2018-03-07 schmitting Draft contributed - V 0.0.2 contributed for Discussion in INT(18)039006 as Early draft
2018-03-07 schmitting A new draft is uploaded - V 0.0.2 with status: Early draft
2018-02-23 schmitting A new draft is uploaded - V 0.0.1 with status: Early draft
2017-02-03 SCHMIDTH TB adoption of WI INT, see contribution INT(16)035024 in RC INT(17)DEC046
2017-01-05 SCHMIDTH WI proposed to TB INT, see contribution INT(16)035024
 
Displaying Item 4 of 13...

ETSI Home Page Any comments or problems with this application? Please let us know...