2024-11-23 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DTR/EE-EEPS29' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DTR/EE-EEPS29 (PDF Format) Download standrd ref:
DTR/EE-EEPS29 (Word Format)
  DTR/EE-EEPS29 TR 103 540   EE EEPS
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2018-04-27) 1.1.1 2018-04-27 View Standstill Information 2016-09-07
  Rapporteur Technical Officer Harmonised Standard
  Daniel Dianat Marcello Pagnozzi No
 
Title Environmental Engineering (EE); Mobile Network (MN) Energy Consumption (EC) estimation method; Energy estimation method based on statistical approach
Energy estimation method based on statistical approach 
Scope and Field
of Application
Providing an estimation method for estimating the total energy consumption of a Mobile Network based on using small portion of data from same Network and statistically approach. 
Supporting
Organizations
Nokia Networks, TELECOM ITALIA S.p.A., Ericsson AB, HUAWEI TECHNOLOGIES Co. Ltd. 

 

Keywords Projects Clusters Frequencies Mandates Directives
  ACCESS
BASE STATION
Energy Management
GSM
LTE
NETWORK
Power Measurement
RADIO
UMTS
WCDMA
  Better Living with ICT
     
Official Journal
     
Remarks
2017-11-17 pagnozzi Draft contributed - V 1.1.5 contributed for Decision in EE(17)052020 as WG approval
2017-10-18 pagnozzi Draft contributed - V 1.1.5 contributed for Decision in EEPS(17)000036 as Final draft for approval
2017-09-05 dianat A new draft is uploaded - V 1.1.5 with status: Final draft for approval - with comment: The issue of using "must" is sloved now.
2017-08-28 dianat A new draft is uploaded - V 1.1.4 with status: Final draft for approval - with comment: The TR has been updated based on the comments regarding using of "Shall" in a TR document.
2017-07-17 gemma Draft contributed - V 1.1.3 contributed for Decision in EEPS(17)000013 as Final draft for approval
2017-07-17 dianat A new draft is uploaded - V 1.1.3 with status: Final draft for approval - with comment: Final draft after ETSI Edit Help
2017-05-31 gemma Draft contributed - V 1.1.2 contributed for Decision in EE(17)051036 as Final draft for approval
2017-05-31 dianat Final draft for approval proposal in contribution EEPS(17)051020 was Withdrawn by EE EEPS
2017-05-31 dianat Draft contributed - V 1.1.2 contributed for Decision in EEPS(17)051023 as Final draft for approval
2017-05-31 dianat A new draft is uploaded - V 1.1.2 with status: Final draft for approval
2017-05-31 dianat Draft contributed - V 1.1.1 contributed for Decision in EEPS(17)051020 as Final draft for approval
2017-05-31 dianat A new draft is uploaded - V 1.1.1 with status: Final draft for approval
2017-02-22 dianat A new draft is uploaded - V 0.0.1 with status: Early draft
2016-09-09 PAGNOZZI TB adoption of WI EE, see contribution EE(16)050023r1
2016-09-09 PAGNOZZI WI proposed to TB EE, see contribution EE(16)050023r1
2016-09-07 PAGNOZZI WI proposed to TB EE, see contribution EE(16)050023
2016-09-07 DIANAT WI accepted by WG EE EEPS, see contribution EEPS(16)050023
2016-09-07 DIANAT WI proposed to WG EE EEPS, see contribution EEPS(16)050023
 

Specific aspects
  User/consumer aspects

ETSI Home Page Any comments or problems with this application? Please let us know...