2024-05-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DES/EE-0260' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DES/EE-0260 (PDF Format) Download standrd ref:
DES/EE-0260 (Word Format)
  DES/EE-0260 ES 203 726   EE 02
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2022-08-26) 1.1.1 2022-08-26 View Standstill Information 2016-05-25
  Rapporteur Technical Officer Harmonised Standard
  Richard Hockley Marcello Pagnozzi No
 
Title Environmental Engineering (EE); Progressive migration of Information and Communication Technology (ICT) site to 400 VDC sources and distribution
progressive migration of ICT site to 400VDC (TA-ITU:L.1207) 
Scope and Field
of Application
This document will give solutions for progressive migration of telecom/ICT sites to 400VDC distribution and direct use of 400VDC powering at equipment level from 400VDC sources. It describes:
- hybrid architecture with 400/48V conversion close to existing -48V equipment using existing -48V room distribution and ability to clear fuse fault without -48V batteries.
- solution to produce AC as an alternative to UPS to power existing AC equipment. - modular and flexible solution to swap from -48V or AC to 400VDC.
It proposes also 400VDC power transfer between existing 48V centralized source to high power density equipment such as terarouter to save a lot of copper and reduce cable volume having a easier connection. 
Supporting
Organizations
ORANGE, TELECOM ITALIA S.p.A., BT Group Plc, Ericsson AB, Huawei Tech.(UK) Co., Ltd 

 

Keywords Projects Clusters Frequencies Mandates Directives
  Energy Efficiency
POWER SUPPLY
SITE ENGINEERING
  Better Living with ICT
     
Official Journal
     
Remarks
2022-05-12 pagnozzi WG approval proposal in contribution EE(22)061037 was Accepted by EE
2022-05-12 hockleyr Draft contributed - V 0.0.22 contributed for Decision in EE(22)061037 as WG approval
2022-05-12 hockleyr Final draft for approval proposal in contribution EE2(22)061009r1 was Accepted by EE 02
2022-05-12 hockleyr Draft contributed - V 0.0.22 contributed for Decision in EE2(22)061009r1 as Final draft for approval
2022-05-12 hockleyr Final draft for approval proposal in contribution EE2(22)061009 was Revised by EE 02
2022-05-12 HOCKLEYR A new draft is uploaded - V 0.0.22 with status: Final draft for approval
2022-05-12 hockleyr Draft contributed - V 0.0.21 contributed for Decision in EE2(22)061009 as Final draft for approval
2022-05-12 HOCKLEYR A new draft is uploaded - V 0.0.21 with status: Final draft for approval
2022-05-11 hockleyr Draft contributed - V 0.0.20 contributed for Decision in EE2(22)061007 as Final draft for approval
2022-04-23 hockleyr Draft contributed - V 0.0.20 contributed for Decision in EE2(22)005001 as Final draft for approval
2022-04-23 HOCKLEYR A new draft is uploaded - V 0.0.20 with status: Final draft for approval
2021-03-14 hockleyr Final draft for approval proposal in contribution EE2(21)000001 was Noted by EE 02 (see RC EE2(21)DEC039)
2021-01-06 pagnozzi Draft contributed - V 0.0.19 contributed for Decision in EE2(21)000001 as Final draft for approval
2021-01-06 pagnozzi A new draft is uploaded - V 0.0.19 with status: Final draft for approval
2020-08-21 pagnozzi Early draft proposal in contribution EE2(20)000004 was Noted by EE 02 (see RC EE2(20)DEC036)
2020-06-22 pagnozzi Draft contributed - V 0.0.15 contributed for Decision in EE2(20)000004 as Early draft
2020-05-26 hockleyr Draft contributed - V 0.0.15 contributed for Decision in EE2(20)057004 as Early draft
2020-05-26 hockleyr Draft contributed - V 0.0.15 contributed for Decision in EE2(20)057003 as Early draft
2020-05-26 HOCKLEYR A new draft is uploaded - V 0.0.15 with status: Early draft
2020-01-13 pagnozzi Draft contributed - V 0.0.14 contributed for Decision in EE(20)000001 as WG approval
2019-12-30 gemma Draft contributed - V 0.0.14 contributed for Decision in EE(19)000009 as WG approval
2019-12-30 hockleyr Draft contributed - V 0.0.14 contributed for Decision in EE(19)000008 as WG approval
2019-12-30 hockleyr WG approval proposal in contribution EE2(19)056009 was Accepted by EE 02 (see RC EE2(19)DEC034)
2019-11-13 gemma Draft contributed - V 0.0.14 contributed for Decision in EE2(19)056009 as Final draft for approval
2019-11-12 gemma A new draft is uploaded - V 0.0.14 with status: Final draft for approval
2018-03-27 marquet A new draft is uploaded - V 0.0.13 with status: Final draft for approval - with comment: consented draft at Feb 2018 ITU-T meeting, to be converted to ETSI format by EE2 editor
2017-11-18 marquet Draft contributed - V 0.0.12 contributed for Discussion in EE2(17)052009 as Stable draft
2017-11-18 marquet A new draft is uploaded - V 0.0.12 with status: Stable draft - with comment: editorial review of ref, definition and some small other
2017-11-17 marquet Draft contributed - V 0.0.11 contributed for Discussion in EE2(17)052008 as Stable draft
2017-11-17 marquet A new draft is uploaded - V 0.0.11 with status: Stable draft - with comment: Edition work on draft V0010
2017-11-13 marquet Draft contributed - V 0.0.10 contributed for Discussion in EE2(17)052002 as Stable draft
2017-11-13 marquet A new draft is uploaded - V 0.0.10 with status: Stable draft - with comment: based on edition of C0171r1 for ITU-T and ETSI
2017-10-02 marquet Draft contributed - V 0.0.9 contributed for Discussion in EE2(17)512005 as Early draft
2017-10-02 marquet A new draft is uploaded - V 0.0.9 with status: Early draft - with comment: result draft of 6 sept joint EE2 Q6_5 e-meeting
2017-09-03 marquet A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: clean draft from previous emeeting 16 AUgust for 6 sept e-meeting
2017-09-03 marquet Draft contributed - V 0.0.7 contributed for Discussion in EE2(17)511004 as Early draft
2017-09-03 marquet A new draft is uploaded - V 0.0.7 with status: Early draft - with comment: revision of 27 june with ITU-T
2017-06-20 marquet Draft contributed - V 0.0.6 contributed for Discussion in EE2(17)511002 as Early draft
2017-05-31 marquet A new draft is uploaded - V 0.0.6 with status: Early draft - with comment: Revision in Joint EE2 Q6 31th May meeting
2017-05-27 marquet Draft contributed - V 0.0.5 contributed for Discussion in EE2(17)051012 as Early draft
2017-05-27 marquet A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Latest draft with Huawei comments for discussion and progress
2017-05-27 marquet A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: draft from ITU-T 15 MAy Geneva
2017-05-13 marquet Draft contributed - V 0.0.3 contributed for Information in EE2(17)051005 as Early draft
2017-05-13 marquet A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: version proposed at ITU Q6 15-24 May
2016-11-09 marquet Draft contributed - V 0.0.2 contributed for Discussion in EE2(16)501006 as Early draft
2016-11-09 marquet A new draft is uploaded - V 0.0.2 with status: Early draft - with comment: Result of joint GTM 9 Nov 2016
2016-09-04 marquet Draft contributed - V 0.0.1 contributed for Discussion in EE2(16)050012 as Early draft
2016-09-04 marquet A new draft is uploaded - V 0.0.1 with status: Early draft
2016-05-26 GORINI TB adoption of WI EE, see contribution EE(16)049036r1
2016-05-26 GORINI WI proposed to TB EE, see contribution EE(16)049036r1
2016-05-26 GORINI WI proposed to TB EE, see contribution EE(16)049036
2016-05-26 GORINI WI accepted by WG EE 02, see contribution EE2(16)049016r1
2016-05-26 GORINI WI proposed to WG EE 02, see contribution EE2(16)049016r1
2016-05-25 MARQUET WI proposed to WG EE 02, see contribution EE2(16)049016
 

Specific aspects
  Environmental aspects

ETSI Home Page Any comments or problems with this application? Please let us know...