0 Work Programme - Work Item Detailed Report
2019-03-20 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DMI/NFV-EVE006' Work Item
Work Item Reference Type STF Technical Body
in Charge
Not Available for Download
  DMI/NFV-EVE006 MI   NFV EVE
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Early draft (2018-11-30) 0.0.10 Draft   View Standstill Information 2015-02-13
  Rapporteur Technical Officer Harmonized Standard
  Tony Saboorian Laurent Vreck No
 
Title Network Functions Virtualisation (NFV); Ecosystem Report on NFV Industry Roadmap
NFV Industry Roadmap 
Scope and Field
of Application
This Miscellaneous Item proposes the development of an industry roadmap for NFV. This Miscellaneous Item is expected to include information on the current planned activities of the ISG in terms of its deliverables, as well as information from other industry bodies (both specification development bodies as well as open source communities) on their expected deliverables which are either (i) dependent on NFV activities, or where (ii) NFV ISG activities are dependent on activities in those other bodies.

From the ISG mission statement: “The NFV ISG’s mission is to facilitate the industry transformation and development of an open, interoperable, ecosystem through specification, implementation and deployment experience. As the focal-point for the NFV ecosystem, the ISG maintains core NFV documentation, including an architectural framework and associated technical requirements, as well as liaison relationships with other specialist SDOs and industry alliances contributing technology or applying NFV concepts within their specializations…As the focal point for the NFV ecosystem, the ISG provides direction for NFV related messaging, conferences and events as well as proactively fostering continuing innovation in the NFV concept in academic research communities.”

The roadmap should include identification of other industry bodies with relevant NFV work programs, their deliverable milestones and the dependencies with the ETSI NFV ISG work program.

The information in this MI is recognized as being subject to change as the work unfolds in various industry bodies. As a Miscellaneous Item, the results of this work item will not lead to any type of ETSI deliverable. Instead, outputs of this MI will include (among others): status reports, presentations, etc., delivered in a continuous manner. Results of this WI, approved by the ISG, can be made available in the NFV Open Area on a roughly quarterly basis.
 
Supporting
Organizations
ORANGE, Nokia Networks, Ericsson LM, TELEFONICA S.A., Deutsche Telekom AG, CableLabs, DOCOMO Communications Lab., AT&T GNS Belgium SPRL, Huawei Technologies (UK) 

 

Keywords Projects Clusters Frequencies Mandates Directives
  NFV
REPORT
         
Official Journal
     
Remarks
2018-11-30 saboorian A new draft is uploaded - V 0.0.10 with status: Early draft
2018-02-27 saboorian A new draft is uploaded - V 0.0.9 with status: Early draft
2017-12-20 maisonneuve1 Early draft proposal in contribution NFVEVE(17)000318 was Accepted by NFV EVE
2017-11-27 saboorian Draft contributed - V 0.0.8 contributed for Information in NFVEVE(17)000318 as Early draft
2017-11-27 saboorian A new draft is uploaded - V 0.0.8 with status: Early draft - with comment: Updated Clause 5.x; Updated Clause 7.x; Updated Clause 8.x with inputs from Liaison Reports from NFV_19+
2017-02-11 saboorian Draft contributed - V 0.0.7 contributed for Discussion in NFVEVE(17)000029 as Early draft
2017-02-11 saboorian A new draft is uploaded - V 0.0.7 with status: Early draft - with comment: Updated Clause 5.x; Updated Clause 7.x with inputs from Liaison Reports
2016-05-04 saboorian A new draft is uploaded - V 0.0.6 with status: Early draft
2016-02-01 saboorian A new draft is uploaded - V 0.0.5 with status: Early draft - with comment: Version 0.0.5
2015-10-23 saboorian A new draft is uploaded - V 0.0.4 with status: Early draft - with comment: updated draft.
2015-08-18 saboorian A new draft is uploaded - V 0.0.3 with status: Early draft - with comment: Updated after NFV_11
2015-05-25 saboorian A new draft is uploaded - V 0.0.2 with status: Early draft
2015-04-15 saboorian Draft contributed - V 0.0.1 contributed for Discussion in NFVEVE(15)000152 as Early draft
2015-04-15 saboorian A new draft is uploaded - V 0.0.1 with status: Early draft
2015-02-24 TRIAY TB adoption of WI NFV, see contribution NFV(15)000020r1
2015-02-20 TRIAY WI proposed to TB NFV, see contribution NFV(15)000020r1
2015-02-13 TRIAY WI proposed to TB NFV, see contribution NFV(15)000020
 
Displaying Item 68 of 72...

ETSI Home Page Any comments or problems with this application? Please let us know...