2024-05-03 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'DGS/NFV-0012' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
DGS/NFV-0012 (PDF Format) Download standrd ref:
DGS/NFV-0012 (Word Format)
  DGS/NFV-0012 GS NFV 004   NFV
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2013-10-10) 1.1.1 2013-10-10 View Standstill Information 2013-04-26
  Rapporteur Technical Officer Harmonised Standard
  Susana Sabater Louise Clarke No
 
Title Network Functions Virtualisation (NFV); Virtualisation Requirements
NFV Virtualisation Requirements 
Scope and Field
of Application
This WI specifies the requirements on Network Functions Virtualisation in order to consolidate network equipment, belonging to fixed and mobile networks, onto industry standard high volume servers, switches and storage, which could be located in Datacentres, Network Nodes and in end user premises. This work will address the requirements on the following areas:• Portability/Interoperability. • Performance.• Elasticity• Security • Resiliency. • Network Stability. • Service continuity• Operations• Energy Efficiency • Migration and co-existence with existing platforms. And will address high level requirements for the virtualisation domains, i.e. Infrastructure domain, applications domain and management and orchestration domain as well as the requirements inherent to the interactions amongst them
 
Supporting
Organizations
AT&T GNS Belgium SPRL; BT Group Plc; Cisco Systems Belgium; DOCOMO Communications Lab.; Deutsche Telekom AG; Telefon AB LM Ericsson; Hewlett-Packard; Huawei Technologies (UK); NEC EUROPE LTD; Nokia Siemens Networks ; NTT corporation ; France Tele 

 

Keywords Projects Clusters Frequencies Mandates Directives
  NFV
Requirements
  Networks
     
Official Journal
     
Remarks
2013-10-07 clarkel Start of pre-processing proposal in contribution NFV(13)000156 was Noted by NFV (see RC NFV(13)DEC006)
2013-09-23 clarkel Draft contributed - V 0.1.11 contributed for Decision in NFV(13)000156 as Final draft for approval
2013-09-20 sabater A new draft is uploaded - V 0.1.11 with status: Final draft for approval - with comment: Editorial corrections after Rapp meeting _2. Added a corrected p-CR
2013-09-19 sabater A new draft is uploaded - V 0.1.10 with status: Final draft for approval
2013-08-20 sabater Draft contributed - V 0.1.9 contributed for Decision in NFV(13)R02003 as Stable draft
2013-08-09 sabater A new draft is uploaded - V 0.1.9 with status: Stable draft - with comment: Output from NFV_3
2013-07-26 sabater Draft contributed - V 0.1.8 contributed for Decision in NFV(13)M03046 as Early draft
2013-07-26 sabater A new draft is uploaded - V 0.1.8 with status: Early draft - with comment: Contains contributions agreed during email agreement, after Call_6 and before NFV_3
2013-07-17 sabater Draft contributed - V 0.1.7 contributed for Decision in NFV(13)M03024 as Early draft
2013-07-17 sabater A new draft is uploaded - V 0.1.7 with status: Early draft - with comment: Agreed output from REQ Call _6
2013-07-14 sabater Draft contributed - V 0.1.6 contributed for Decision in NFV(13)REQ036 as Early draft
2013-07-12 sabater A new draft is uploaded - V 0.1.6 with status: Early draft - with comment: Updated after REQ call_5 (10th July)
2013-07-04 sabater Draft contributed - V 0.1.5 contributed for Decision in NFV(13)REQ029 as Early draft
2013-07-04 sabater A new draft is uploaded - V 0.1.5 with status: Early draft - with comment: Drfat result from REQ Call_4
2013-06-20 sabater Draft contributed - V 0.1.4 contributed for Decision in NFV(13)REQ022 as Early draft
2013-06-20 sabater A new draft is uploaded - V 0.1.4 with status: Early draft - with comment: Contains agreed contributions from Rapp_1 meeting (NFV(13)R01016r1 and NFV(13)R01019r2). A number of editorial fixes included following editing rules.
2013-06-10 sabater Draft contributed - V 0.1.3 contributed for Decision in NFV(13)R01005 as Early draft
2013-06-07 sabater A new draft is uploaded - V 0.1.3 with status: Early draft - with comment: Version after REQ call _3 (5th of June)
2013-05-22 sabater Draft contributed - V 0.1.2 contributed for Decision in NFV(13)REQ020 as Early draft
2013-05-22 sabater A new draft is uploaded - V 0.1.2 with status: Early draft - with comment: Updated after REQ call _2
2013-05-09 sabater Draft contributed - V 0.1.1 contributed for Decision in NFV(13)REQ014 as Early draft
2013-05-09 sabater A new draft is uploaded - V 0.1.1 with status: Early draft - with comment: Output draft from REQ Call_1
2013-05-07 mancini A new draft is uploaded - V 0.1.0 with status: Early draft
2013-05-04 sabater Early draft proposal in contribution NFV(13)M02060 was Withdrawn by NFV
2013-05-04 sabater Draft contributed - V 0.0.1 contributed for Decision in NFV(13)M02060 as Early draft
2013-04-26 clarkel A new draft is uploaded - V 0.0.1 with status: Early draft
 

ETSI Home Page Any comments or problems with this application? Please let us know...