2024-10-13 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help

Details of 'RGS/ORI-0013' Work Item
Work Item Reference ETSI Doc.
Number
STF Technical Body
in Charge
Download Standard

Download standrd ref:
RGS/ORI-0013 (PDF Format) Download standrd ref:
RGS/ORI-0013 (Word Format)
  RGS/ORI-0013 GS ORI 002-2   ORI
  Current Status
(Click to View Full Schedule)
Latest
Version
Cover Date Standstill Creation Date
  Publication (2013-05-02) 1.2.1 2013-05-02   2013-03-04
  Rapporteur Technical Officer Harmonised Standard
  Tim Frost Estelle Mancini No
 
Title Open Radio equipment Interface (ORI); ORI Interface Specification; Part 2: Control and Management (Release 1)
ORI Release 1 Control and Management Interface specification 
Scope and Field
of Application
The scope of this work item is to provide some essential corrections to the C&M specification in terms of coding and specification text, that may prevent interoperability of REC and RE implementations of different vendors.

 
Supporting
Organizations
Alcatel-Lucent, VODAFONE Group Plc, Deutsche Telekom AG, AT&T GNS Belgium SPRL 

 

Keywords Projects Clusters Frequencies Mandates Directives
  CONTROL
INTERFACE
MANAGEMENT
RADIO
  Better Living with ICT
Wireless Systems
     
Official Journal
     
Remarks
2013-03-21 mancini Working Draft proposal in contribution ORI(13)M15021 was Accepted by ORI
2013-03-21 mancini Draft contributed - V 1.2.1 contributed for Decision in ORI(13)M15021 as Working Draft
2013-03-12 MANCINI TB adoption of WI ORI, see contribution ORI(13)M15012r1
2013-03-08 frost A new draft is uploaded - V 1.2.1 with status: Preliminary Draft
2013-03-05 MANCINI WI proposed to TB ORI, see contribution ORI(13)M15012r1
2013-03-04 MANCINI WI proposed to TB ORI, see contribution ORI(13)M15012
 
Displaying Item 6 of 18...

ETSI Home Page Any comments or problems with this application? Please let us know...