|
Work Item Reference |
ETSI Doc. Number |
STF |
Technical Body in Charge |
Standard Not Ready For Download
|
|
RES/EE-02107
|
ES 202 336-11
|
|
EE 02
|
|
Current Status (Click to View Full Schedule) |
Latest Version
|
Cover Date |
Standstill |
Creation Date |
|
Early draft (2024-06-12)
|
0.0.2 Draft
|
|
View Standstill Information
|
2023-06-14
|
|
Rapporteur |
Technical Officer |
Harmonised Standard |
|
|
Paolo Gemma
|
Laure Pourcin
|
No
|
|
|
Title
|
Environmental Engineering (EE); Monitoring and control interface for infrastructure equipment (Power, Cooling and environment systems used in telecommunication networks); Part 11: Battery system with integrated control and monitoring information model Battery system control and monitoring information model revision( ITU -TA: L.MON_bat)
|
Scope and Field of Application
|
Revise battery part to consider the revision of part1 and other battery related standards (TS 103 553-1, TS 103 553-2, TS 103 553-3, ES 203 700). Also to consider relevant IEC standards.
|
Supporting Organizations
|
TELECOM ITALIA S.p.A., Deutsche Telekom AG, HUAWEI TECHNOLOGIES Co. Ltd., Ericsson L.M., BT plc, Newen Srl
|