|
Work Item Reference |
ETSI Doc. Number |
STF |
Technical Body in Charge |
Standard Not Ready For Download
|
|
DGS/ZSM-016_IntentDrvCL
|
GS ZSM 016
|
|
ZSM
|
|
Current Status (Click to View Full Schedule) |
Latest Version
|
Cover Date |
Standstill |
Creation Date |
|
Stable draft (2024-03-27)
|
0.1.0 Draft
|
|
View Standstill Information
|
2022-11-11
|
|
Rapporteur |
Technical Officer |
Harmonised Standard |
|
|
Andrey Silva
|
Kim Nordström
|
No
|
|
|
Title
|
Zero-touch network and Service Management (ZSM); Intent-driven Closed Loops Intent-driven Closed Loops
|
Scope and Field of Application
|
The work item will specify capabilities to support the combination of closed-loop automation with intents originating from ZSM consumers (via northbound interface), focusing on intent-driven governance and coordination of closed loops. The scope of this work includes use cases, additional requirements related to intent-driven aspects of ZSM009-1, as well as procedures and information models. This work item will create a normative specification covering stages 1 and 2. It will also identify and describe additions to ETSI ZSM002 v1.1.1 and ETSI ZSM009-1 v1.1.1 topics related to the handling of intent and non-intent interactions will be considered as needed. Related work in ETSI, other SDOs and open-source projects will be considered and used where applicable.
|
Supporting Organizations
|
TELENOR ASA, Ericsson LM, TELEFONICA S.A., Deutsche Telekom AG, DOCOMO Communications Lab., Nokia Germany
|