2024-05-08 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing' Matching One of The Keywords 'ATS, CONFORMANCE, ICS, PICS, TESTING'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 111 Items...
Displaying items 1 to 10 ...
  IDENTIFICATION TITLE STATUS
1
Doc. Nb. GS NFV-SOL 010
Ref. RGS/NFV-TST010ed441
Technical Body: NFV SOL
Details and Download
Network Functions Virtualisation (NFV) Release 4;
Testing
API Conformance Testing Specification
API Conformance Testing
Drafting Stage
Current Status:
Start of work (2024-04-15)
Next Status:
Early draft (2024-04-25)
2
Doc. Nb. GS mWT 029-3
Ref. DGS/mWT-0029-3
Technical Body: mWT
Details and Download
millimetre Wave Transmission (mWT);
Conformance Test Specification for Wireless Transport Profile for Standard SDN Northbound Interfaces;
Part 3: Abstract Test Suite (ATS) and partial Implementation eXtra Information for Testing (IXIT)
mWT SDN NBI Abstract Test Suite (ATS) and partial Implementation eXtra Information for Testing (IXIT
Drafting Stage
Current Status:
Start of work (2023-10-30)
Next Status:
Early draft (2024-06-30)
3
Doc. Nb. GS mWT 029-2 Ver. 0.0.1
Ref. DGS/mWT-0029-2
Technical Body: mWT
Details and Download
millimetre Wave Transmission (mWT);
Conformance Test Specification for Wireless Transport Profile for Standard SDN Northbound Interfaces;
Part 2: Test Suite Structure (TSS) and Test Purposes (TP);
mWT SDN NBI Test Suite Structure (TSS) and Test Purposes (TP)
Drafting Stage
Current Status:
Early draft (2024-01-30)
Next Status:
Stable draft (2024-06-30)
4
Doc. Nb. GS mWT 029-1 Ver. 0.0.1
Ref. DGS/mWT-0029-1
Technical Body: mWT
Details and Download
millimetre Wave Transmission (mWT);
Conformance Test Specification for Wireless Transport Profile for Standard SDN Northbound Interfaces;
Part 1: Implementation Conformance Statement (ICS);
mWT SDN NBI Implementation Conformance Statement (ICS)
Drafting Stage
Current Status:
Stable draft (2024-03-29)
Next Status:
Final draft for approval
5
Doc. Nb. GS MEC-DEC 032-3 Ver. 3.1.2
Ref. RGS/MEC-DEC32-3v321ApiTest
Technical Body: MEC DECODE
Details and Download
Multi-access Edge Computing (MEC);
API Conformance Test Specification;
Part 3: Abstract Test Suite (ATS)
Drafting Stage
Current Status:
Early draft (2023-04-05)
Next Status:
Stable draft (2024-06-30)
6
Doc. Nb. GS MEC-DEC 032-2 Ver. 3.1.4
Ref. RGS/MEC-DEC32-2v321ApiTest
Technical Body: MEC DECODE
Details and Download
Multi-access Edge Computing (MEC);
API Conformance Test Specification;
Part 2: Test Purposes (TP)
Drafting Stage
Current Status:
Early draft (2024-03-22)
Next Status:
Stable draft (2024-06-30)
7
Doc. Nb. GS MEC-DEC 032-1 Ver. 3.2.3
Ref. RGS/MEC-DEC32-1v331ApiTest
Technical Body: MEC DECODE
Details and Download
Multi-access Edge Computing (MEC);
API Conformance Test Specification;
Part 1: Test Requirements and Implementation Conformance Statement (ICS)
Drafting Stage
Current Status:
Early draft (2024-03-28)
Next Status:
Stable draft (2024-06-28)
8
Doc. Nb. GS CIM 053
Ref. DGS/CIM-0053
Technical Body: CIM
Details and Download
cross-cutting Context Information Management (CIM);
NGSI-LD Test Suite;
NGSI-LD Test purposes descriptions for Distributed Operations
NGSI-LD Test purposes descriptions for Distributed Operations TTF3 D3.2
Drafting Stage
Current Status:
TB adoption of WI (2023-10-11)
Next Status:
Start of work (2024-05-02)
9
Doc. Nb. GS CIM 029
Ref. RGS/CIM-0029v211
Technical Body: CIM
Details and Download
cross-cutting Context Information Management (CIM);
NGSI-LD Implementation Conformance Statement

NGSI-LD Implementation Conformance Statement TTF3 D7
Drafting Stage
Current Status:
TB adoption of WI (2023-10-11)
Next Status:
Start of work (2024-05-02)
10
Doc. Nb. GS CIM 027
Ref. RGS/CIM-0027v211
Technical Body: CIM
Details and Download
cross-cutting Context Information Management (CIM);
NGSI-LD Testing Framework:
Test Purposes Description Language (TPDL)
NGSI-LD Testing Framework: Test Purposes Description Language (TPDL) TTF3 D1
Drafting Stage
Current Status:
TB adoption of WI (2023-10-11)
Next Status:
Start of work (2024-05-02)
  Found 111 Items...
Displaying items 1 to 10 ...

Display Items/Page

New Query

ETSI Home Page Any comments or problems with this application? Please let us know...