2020-01-24 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items For INT in Project(s) 'elease-15, '
View As Work Item Plan  |  View As Work Item Progress Report
  Found 3 Items...
Displaying items 1 to 3 ...
 
  IDENTIFICATION TITLE (Formal & Working) STATUS
1
Doc. Nb. TS 103 653-3 Ver. 0.0.2
Ref. DTS/INT-00159-3
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
VoLTE/ViLTE interoperability test description over 4G/early 5G in physical/virtual environments; (3GPP™ Release 15);
Part 3: ATS&PIXIT for VoLTE/ViLTE interoperability
ATS&PIXIT for VoLTE/ViLTE interoperability
Drafting Stage
Current Status:
Early draft (2019-06-03)
Next Status:
Stable draft (2020-03-30)
2
Doc. Nb. TS 103 653-2 Ver. 0.0.11
Ref. DTS/INT-00159-2
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
VoLTE/ViLTE interoperability test description over 4G/early 5G in physical/virtual environments; (3GPP™ Release 15);
Part 2: Test Descriptions for VoLTE/ViLTE interoperability
Test Descriptions for VoLTE/ViLTE interoperability
Drafting Stage
Current Status:
Early draft (2019-11-08)
Next Status:
Stable draft (2020-03-30)
3
Doc. Nb. TS 103 653-1 Ver. 0.0.6
Ref. DTS/INT-00159-1
Technical Body: INT
Details and Download
Core Network and Interoperability Testing (INT);
VoLTE/ViLTE interoperability test description over 4G/early 5G in physical/virtual environments; (3GPP™ Release 15);
Part 1: Test Purposes&PICS for VoLTE/ViLTE interoperability
Test Purposes&PICS for VoLTE/ViLTE interoperability
Drafting Stage
Current Status:
Stable draft (2019-11-25)
Next Status:
Final draft for approval
(2020-03-30)

  Found 3 Items...
Displaying items 1 to 3 ...
 
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...