2019-01-17 Version 2.3.3
Simple Search | Advanced Search | Pre-Defined Reports | Help
All Active Work Items For RT,RT JTFIR,RT NG2R For Current Status: From 'Creation of WI by WG/TB' Up to 'End of pre-processing'
View As Work Item Plan  |  View As Work Item Progress Report
  Found 7 Items...
Displaying items 1 to 7 ...
 
  IDENTIFICATION TITLE (Formal & Working) STATUS
1
Doc. Nb. TR 103 580 Ver. 0.0.11
Ref. DTR/RT-JTFIR-2
Technical Body: RT JTFIR
Details and Download
Extension of the 5.9GHz band for safety related Intelligent Transport Systems (ITS)


Drafting Stage
Current Status:
Stable draft (2019-01-07)
Next Status:
Final draft for approval
(2018-11-30)

2
Doc. Nb. TR 103 554-1 Ver. 1.2.1
Ref. RTR/RT-0048-1
Technical Body: RT
Details and Download
Rail Telecommunications (RT);
Next Generation Communication System; Radio performance simulations and evaluations in rail environment;
Part 1: Long Term Evolution (LTE)
RT LTE simulations
Drafting Stage
Current Status:
TB approval (2019-01-17)
Next Status:
Draft receipt by ETSI Secretariat
(2019-01-31)

3
New Work Item
Doc. Nb. TR 103 554-1
Ref. RTR/RT-0051
Technical Body: RT
Details and Download
Rail Telecommunications (RT);
Next Generation Communication System; Radio performance simulations and evaluations in rail environment;
Part 1: Long Term Evolution (LTE)
RT LTE simulations
Drafting Stage
Current Status:
Start of work (2019-01-17)
Next Status:
Early draft (2019-06-28)
4
Changed Work Item
Doc. Nb. TS 103 518
Ref. DTS/RT-JTFIR-1
Technical Body: RT JTFIR
Details and Download
Urban Rail and ITS applications in the 5855-5925 MHz frequency band;
Requirements for the shared use of spectrum

Drafting Stage
Current Status:
Start of work (2017-04-12)
Next Status:
Early draft (2019-06-30)
5
New Work Item
Doc. Nb. TR 103 459
Ref. RTR/RT-0052
Technical Body: RT
Details and Download
Rail Telecommunications (RT);
Future Rail Mobile Communication System (FRMCS);
Study on system architecture
FRMCS Architecture
Drafting Stage
Current Status:
TB adoption of WI (2019-01-17)
Next Status:
Start of work (2019-01-17)
6
Changed Work Item
Doc. Nb. TS 102 281 Ver. 0.0.4
Ref. RTS/RT-0043
Technical Body: RT
Details and Download
Rail Telecommunications (RT);
Global System for Mobile communications (GSM);
Detailed requirements for GSM operation on Railways
GSM on railways, requirements
Drafting Stage
Current Status:
Draft receipt by ETSI Secretariat
(2019-01-14)

Next Status:
Publication (2019-02-11)
7
Deliverable Type: TR
Ref. PWI_RT_1901_v2
Technical Body: RT
Details and Download
Rail Telecommunications (RT); Next Generation Communication System; Radio performance simulations and evaluations in rail environment;
Part 2: 5G New Radio (NR)

NR simulations
Drafting Stage
Current Status:
WI proposed to TB (2019-01-17)
Next Status:
TB adoption of WI (2019-02-25)
  Found 7 Items...
Displaying items 1 to 7 ...
 
New Query

ETSI Home Page Any comments or problems with this application? Please let us know...